i
Hinduja Renewables
Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 3 interview rounds.
Top trending discussions
posted on 19 Jan 2022
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Land acquisition process is the legal process of acquiring land for public or private use.
Identifying the land to be acquired
Negotiating with landowners or acquiring through eminent domain
Determining fair compensation for the land
Obtaining necessary permits and approvals
Transferring ownership of the land
Examples include acquiring land for building roads, schools, or shopping centers
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
PV solar refers to photovoltaic solar technology, which converts sunlight into electricity using solar panels.
PV solar technology uses solar panels made of photovoltaic cells to convert sunlight into electricity.
The rejection rate of cells by a company can vary depending on the quality control measures in place.
Topcon Technology is a solar cell manufacturing technique that involves creating a thin layer of semiconducto...
I was interviewed before Feb 2024.
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Psychometric test happened online
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
Clearances in the station refer to the process of ensuring that all necessary approvals and permissions are obtained before proceeding with a task or project.
Clearances may include safety clearances, security clearances, and regulatory clearances.
Examples of clearances in a station could be obtaining permission from the fire department before conducting a fire drill, or ensuring that all employees have completed backgr...
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Finance Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Green Energy
Azure Power
ReNew
Hero Future Energies