Filter interviews by
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
Top trending discussions
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
posted on 8 Apr 2024
posted on 22 Feb 2022
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 22 Jan 2025
I appeared for an interview in Dec 2024.
Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of its successor activity.
Total Float is calculated by subtracting Early Start (ES) from Late Start (LS) or Early Finish (EF) from Late Finish (LF).
Free Float is calculated by subtracting Early Start (ES) of the succ...
Earned Value Analysis (EVA) is a project management technique used to measure project performance and progress by comparing planned work with actual work completed.
EVA integrates scope, schedule, and cost to provide a comprehensive view of project performance.
Key EVA metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC).
EVA helps in forecasting project outcomes, identifying variances, and making d...
Key aspects to consider in delay analysis include identifying causes, assessing impact, analyzing critical path, and determining responsibility.
Identifying the causes of delays, such as design changes, weather conditions, or resource constraints
Assessing the impact of delays on the project timeline and budget
Analyzing the critical path to determine which activities are most critical to the project schedule
Determining r...
I would rate my proficiency in P6/MSP as an 8 out of 10.
I have extensive experience using P6/MSP in previous projects.
I have successfully created and managed complex schedules using P6/MSP.
I have received positive feedback on my proficiency in P6/MSP from colleagues and supervisors.
Different types of contracts include fixed-price, cost-reimbursable, time and materials, and unit price contracts.
Fixed-price contracts: Price is agreed upon upfront and does not change regardless of actual costs incurred.
Cost-reimbursable contracts: Contractor is reimbursed for all allowable costs incurred, plus a fee.
Time and materials contracts: Payment is based on actual hours worked and materials used, with a pre-...
Reconciliation of steel and concrete is the process of verifying the quantity of steel and concrete used in a construction project.
It involves comparing the actual quantity of steel and concrete used with the planned quantity.
Any discrepancies are identified and addressed.
Reconciliation ensures that the structure is safe and meets the design requirements.
It also helps in controlling costs and avoiding wastage of materi...
based on 3 reviews
Rating in categories
Quantity Surveyor
36
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Senior Quantity Surveyor
30
salaries
| ₹6.5 L/yr - ₹10.5 L/yr |
Civil Engineer
28
salaries
| ₹4.6 L/yr - ₹11.7 L/yr |
Manager Costing
26
salaries
| ₹8.4 L/yr - ₹14 L/yr |
Assistant Costing Manager
18
salaries
| ₹7.6 L/yr - ₹12.1 L/yr |
Nasser S. Al Hajri Corporation
Bahwan Engineering
Tractebel
Leighton Contractors