Reconciliation of steel and concrete is the process of verifying the quantity of steel and concrete used in a construction project.
It involves comparing the actual quantity of steel and concrete used with the planned quantity.
Any discrepancies are identified and addressed.
Reconciliation ensures that the structure is safe and meets the design requirements.
It also helps in controlling costs and avoiding wastage of materi...
Top trending discussions
posted on 6 Feb 2025
posted on 18 Jul 2024
posted on 12 Nov 2024
I applied via Recruitment Consulltant
posted on 25 Jan 2025
Role of engineer to control disaster management
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via LinkedIn and was interviewed before Jul 2021. There were 2 interview rounds.
Project flow steps involve planning, design, implementation, testing, and maintenance.
Planning: Define project scope, objectives, and requirements.
Design: Develop a detailed plan and create schematics.
Implementation: Install and integrate components.
Testing: Verify functionality and performance.
Maintenance: Monitor and update system as needed.
Examples: Building a power distribution system, designing a control panel for
based on 1 interview
Interview experience
Safety Officer
28
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Senior Engineer
25
salaries
| ₹6.5 L/yr - ₹16.5 L/yr |
Assistant Manager
21
salaries
| ₹8 L/yr - ₹15.5 L/yr |
Finishing Engineer
19
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Manager
17
salaries
| ₹12.3 L/yr - ₹29.4 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries