Upload Button Icon Add office photos

Samsung C&T

Compare button icon Compare button icon Compare

Filter interviews by

Samsung C&T Geotechnical Engineer Interview Questions and Answers

Updated 25 Jun 2024

Samsung C&T Geotechnical Engineer Interview Experiences

1 interview found

Geotechnical Engineer Interview Questions & Answers

user image Surabhi Agarwal

posted on 25 Jun 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Jobstreet and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Tell me about the projects involved in

Interview Preparation Tips

Interview preparation tips for other job seekers - Easy and hassle free process. Helpful staff.

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to girder,segment,pier,pier table

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge about ur own work u worked recently

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About my experience and what kind of job i can handle etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Mine experience was Nice , they were also kind and gentle . During interview they help me also to define some terms and specifications etc

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

Interview Questionnaire 

1 Question

  • Q1. Many question ask interviewer technical core about tunnels.

Samsung C&T Interview FAQs

How many rounds are there in Samsung C&T Geotechnical Engineer interview?
Samsung C&T interview process usually has 1 rounds. The most common rounds in the Samsung C&T interview process are Technical.

Tell us how to improve this page.

Samsung C&T Geotechnical Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all
Senior Engineer
23 salaries
unlock blur

₹6.5 L/yr - ₹24.9 L/yr

Assistant Manager
21 salaries
unlock blur

₹8 L/yr - ₹15.5 L/yr

Finishing Engineer
19 salaries
unlock blur

₹4.5 L/yr - ₹12.9 L/yr

Safety Officer
17 salaries
unlock blur

₹2.5 L/yr - ₹5.2 L/yr

MEP Engineer
16 salaries
unlock blur

₹5.1 L/yr - ₹13.8 L/yr

Explore more salaries
Compare Samsung C&T with

L&T Construction

4.0
Compare

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview