i
Hi Tech Projects
Filter interviews by
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
based on 11 reviews
Rating in categories
Planning & Billing Engineer
24
salaries
| ₹3.8 L/yr - ₹8.1 L/yr |
Safety Officer
22
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Junior Engineer
14
salaries
| ₹2.9 L/yr - ₹4.5 L/yr |
Assistant Engineer
12
salaries
| ₹3.6 L/yr - ₹6.2 L/yr |
Tech Mahindra
TCS
Infosys
Wipro