i
Hi Tech Projects
Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2021. There was 1 interview round.
Safety precautions include wearing appropriate PPE, following proper procedures, and regular equipment maintenance. Steel wastage control involves accurate BBS preparation and monitoring on site.
Wear appropriate PPE such as hard hats, safety glasses, and steel-toed boots
Follow proper procedures for handling equipment and materials
Regularly maintain equipment to ensure it is in good working condition
Prepare accurate BBS...
The skill for finishing activities till handover to client requires attention to detail, effective communication, and time management.
Create a detailed project plan with clear timelines and milestones
Regularly communicate progress and any potential delays to the client
Ensure all tasks are completed to a high standard and meet client expectations
Conduct thorough testing and quality assurance before handover
Provide clear...
Top trending discussions
posted on 28 Sep 2023
I applied via Walk-in
Load-bearing capacity in structural engineering refers to the maximum load a structure can support without failing.
Load-bearing capacity is determined by factors such as material strength, design, and support conditions.
Structural engineers calculate load-bearing capacity to ensure safety and prevent structural failure.
Examples of load-bearing elements include columns, beams, and foundations.
Load-bearing capacity can b...
A geotechnical investigation is conducted to assess the soil and rock conditions at a site for construction projects.
Determines the suitability of the site for construction
Identifies potential risks such as landslides, soil liquefaction, or sinkholes
Helps in designing foundations and earthworks
Involves drilling boreholes, taking soil samples, and conducting laboratory tests
Results in a geotechnical report with recommen
posted on 28 Sep 2023
I applied via Walk-in
Load-bearing capacity in structural engineering refers to the maximum load a structure can support without failing.
Load-bearing capacity is determined by factors such as material strength, design, and support conditions.
Structural engineers calculate load-bearing capacity to ensure safety and prevent structural failure.
Examples of load-bearing elements include columns, beams, and foundations.
Load-bearing capacity can b...
A geotechnical investigation is conducted to assess the soil and rock conditions at a site for construction projects.
Determines the suitability of the site for construction
Identifies potential risks such as landslides, soil liquefaction, or sinkholes
Helps in designing foundations and earthworks
Involves drilling boreholes, taking soil samples, and conducting laboratory tests
Results in a geotechnical report with recommen
posted on 10 Oct 2024
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
posted on 25 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
The company is involved in [insert industry] and adheres to industry standards to ensure success and growth.
The company operates in [insert industry] and offers [insert products/services].
Industry standards are followed to ensure quality and safety in all aspects of the business.
Regular market research is conducted to stay up-to-date with industry trends and changes.
The company strives for continuous improvement and in...
posted on 18 Jul 2023
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Some of the top questions asked at the Hi Tech Projects Assistant Engineer interview -
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Planning & Billing Engineer
24
salaries
| ₹4 L/yr - ₹8.1 L/yr |
Safety Officer
22
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Junior Engineer
14
salaries
| ₹2.9 L/yr - ₹4.5 L/yr |
Assistant Engineer
12
salaries
| ₹3.6 L/yr - ₹6.2 L/yr |
Tech Mahindra
TCS
Infosys
Wipro