Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hi Tech Projects Team. If you also belong to the team, you can get access from here

Hi Tech Projects Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Hi Tech Projects Interview Questions, Process, and Tips

Updated 23 Dec 2024

Top Hi Tech Projects Interview Questions and Answers

View all 32 questions

Hi Tech Projects Interview Experiences

Popular Designations

38 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical work related

Senior Electrician Interview Questions asked at other Companies

Q1. What is calibration is the process of configuring an instrument to provide a result for a sample within an acceptable range
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Case Study 

Skills and experience bases.

Interview Preparation Tips

Topics to prepare for Hi Tech Projects Civil Supervisor interview:
  • AutoCAD Drawing
Interview preparation tips for other job seekers - Skills and experience are significant factors.

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)

I applied via Naukri.com and was interviewed before Oct 2021. There was 1 interview round.

Round 1 - Telephonic Call 

(3 Questions)

  • Q1. Regarding how safe you working and your safety manner. What kind of shuttering material had i used during my carrier How I handle client and satisfied them. How much experience of finishing item like plast...
  • Q2. What safety precautions during work Steel wastage control during making bbs and monitoring in site as per drawing.
  • Ans. 

    Safety precautions include wearing appropriate PPE, following proper procedures, and regular equipment maintenance. Steel wastage control involves accurate BBS preparation and monitoring on site.

    • Wear appropriate PPE such as hard hats, safety glasses, and steel-toed boots

    • Follow proper procedures for handling equipment and materials

    • Regularly maintain equipment to ensure it is in good working condition

    • Prepare accurate BBS...

  • Answered by AI
  • Q3. Skill for finishing activities till handover to client
  • Ans. 

    The skill for finishing activities till handover to client requires attention to detail, effective communication, and time management.

    • Create a detailed project plan with clear timelines and milestones

    • Regularly communicate progress and any potential delays to the client

    • Ensure all tasks are completed to a high standard and meet client expectations

    • Conduct thorough testing and quality assurance before handover

    • Provide clear...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hi Tech Projects Assistant Engineer interview:
  • Strategic Planning
  • Coast control
  • Wastage Control
  • Client Relationship
  • Departmental coast control
  • All finshing activities
Interview preparation tips for other job seekers - It's performance based company.you should have knowledge of planning and site/team management.ideas for fruenty work and coast control will first preference.

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

Engineer - Billing & Planning Interview Questions & Answers

user image Anonymous

posted on 11 Feb 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. Where do you see yourself in 5 years?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. Question related to Billing and planning.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident on yourself.

Hi Tech Projects interview questions for popular designations

 Civil Supervisor

 (2)

 Junior Engineer

 (2)

 Safety Supervisor

 (2)

 Senior Electrician

 (2)

 Administration Manager

 (1)

 Assistant Engineer

 (1)

 Assistant General Manager

 (1)

 Billing Engineer

 (1)

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before Apr 2022. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How to start chiller
  • Ans. 

    To start a chiller, ensure power supply, check water flow, set temperature and turn on the chiller.

    • Check power supply and ensure it is connected

    • Check water flow and ensure it is sufficient

    • Set the desired temperature on the chiller control panel

    • Turn on the chiller and monitor for any issues

    • Adjust settings as necessary to maintain desired temperature

  • Answered by AI
  • Q2. How many types of chiller
  • Ans. 

    There are two main types of chillers: air-cooled and water-cooled.

    • Air-cooled chillers use air to remove heat from the refrigerant, while water-cooled chillers use water.

    • Air-cooled chillers are typically used in smaller applications, while water-cooled chillers are used in larger applications.

    • Examples of air-cooled chillers include rooftop units and portable units, while examples of water-cooled chillers include centrif

  • Answered by AI
  • Q3. How many experience in this field

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence must important in interview and eyes contact in important

Chiller Operator Interview Questions asked at other Companies

Q1. Types of compressor and types of chiller compressor
View answer (2)

Get interview-ready with Top Hi Tech Projects Interview Questions

I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Basic knowledge of civil engineering field job
  • Q2. Working experience in your previous firm and knowledge of job details
  • Q3. Your attitude towards work
  • Q4. Your dedication towards work
Round 3 - HR 

(1 Question)

  • Q1. Last company's experience and salary details

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to upgrade yourself with latest working technology and system you have to join this company

Senior Civil Site Engineer Interview Questions asked at other Companies

Q1. B) What is PH value of water for Concrete of Construction ??
View answer (2)

I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Asking Quality Related questions.
Round 3 - HR 

(1 Question)

  • Q1. What is my role in Previous company?

Interview Preparation Tips

Topics to prepare for Hi Tech Projects Quality Engineer interview:
  • Concrete
  • Row material
  • Testing
  • Is code
Interview preparation tips for other job seekers - Working culture is good, especially the ERP system of work, but offering salary is too low as per Experience.

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

I was interviewed in Mar 2017.

Interview Preparation Tips

Round: Resume Shortlist
Experience: shuttring & Reinforcemant
Tips: All type. Civil

Construction Engineer Interview Questions asked at other Companies

Q1. What's your biggest mistakes in your carrier?
View answer (4)

Hi Tech Projects Interview FAQs

How many rounds are there in Hi Tech Projects interview?
Hi Tech Projects interview process usually has 1-2 rounds. The most common rounds in the Hi Tech Projects interview process are One-on-one Round, Technical and HR.
How to prepare for Hi Tech Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hi Tech Projects. The most common topics and skills that interviewers at Hi Tech Projects expect are AutoCAD, Bidding, Boq, Boq Preparation and Business Development.
What are the top questions asked in Hi Tech Projects interview?

Some of the top questions asked at the Hi Tech Projects interview -

  1. How do you ensure that all required documents are fulfilled and maintained acco...read more
  2. What safety precautions during work Steel wastage control during making bbs and...read more
  3. What is the Factory Act of 1948, and what regulations does it outline in each c...read more
How long is the Hi Tech Projects interview process?

The duration of Hi Tech Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Hi Tech Projects Interview Process

based on 74 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 2.9k Interviews
Mphasis Interview Questions
3.4
 • 788 Interviews
Cyient Interview Questions
3.6
 • 283 Interviews
View all

Fast track your campus placements

View all

Hi Tech Projects Reviews and Ratings

based on 307 reviews

4.6/5

Rating in categories

4.6

Skill development

4.5

Work-life balance

4.5

Salary

4.6

Job security

4.6

Company culture

4.3

Promotions

4.5

Work satisfaction

Explore 307 Reviews and Ratings
Planning & Billing Engineer
24 salaries
unlock blur

₹4 L/yr - ₹8.1 L/yr

Safety Officer
22 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Junior Engineer
14 salaries
unlock blur

₹2.9 L/yr - ₹4.5 L/yr

Assistant Engineer
12 salaries
unlock blur

₹3.6 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Hi Tech Projects with

Tech Mahindra

3.5
Compare

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview