I applied via Campus Placement and was interviewed before Dec 2023. There were 3 interview rounds.
30 mark paper of engineering study
The process of site work involves planning, preparation, execution, and monitoring of construction activities.
Site assessment and surveying to understand the land and its surroundings
Developing a detailed construction plan and schedule
Preparing the site by clearing vegetation, leveling the ground, and setting up temporary facilities
Executing the construction activities according to the plan
Monitoring progress, quality,...
posted on 9 Dec 2020
I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
posted on 22 Feb 2022
posted on 4 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Aggregate code and soil code
Codeing testing and ms words and any questions solve
posted on 30 Apr 2021
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Precast structures are pre-made concrete elements used in construction.
Precast segments are manufactured off-site and transported to the construction site for assembly.
They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.
Precast segments can be designed to fit specific project requirements, reducing construction time and costs.
They offer high durability and strength, and...
Segment casting can be done using various methods depending on the material and application.
One method is sand casting, where a mold is created using sand and the molten metal is poured into it.
Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.
Die casting is a method where molten metal is forced into a mold under high pressure.
Continuous casting is u...
Grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of concrete in megapascals (MPa).
Common grades of concrete include M10, M20, M30, etc.
Higher grade concrete has higher strength and durability.
For example, M20 grade concrete has a compressive strength of 20 MPa.
Design mix of concrete refers to the proportion of materials used in making concrete.
Design mix is determined based on the strength and durability requirements of the concrete.
The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.
The proportions of each material are specified in terms of weight or volume.
For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...
Segment casting is a method of casting concrete segments for tunnel lining.
Segments are cast in a factory and transported to the tunnel site.
Segments are then assembled to form a complete tunnel lining.
This method is commonly used in tunnel construction projects.
It allows for faster construction and better quality control.
Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.
posted on 11 Dec 2023
I applied via Referral
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Planning & Billing Engineer
24
salaries
| ₹4 L/yr - ₹8.1 L/yr |
Safety Officer
21
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Junior Engineer
14
salaries
| ₹2.9 L/yr - ₹4.5 L/yr |
Assistant Engineer
12
salaries
| ₹3.6 L/yr - ₹6.2 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons