Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hi Tech Projects Team. If you also belong to the team, you can get access from here

Hi Tech Projects Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Hi Tech Projects Senior Civil Site Engineer Interview Questions and Answers

Updated 20 Dec 2022

Hi Tech Projects Senior Civil Site Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Basic knowledge of civil engineering field job
  • Q2. Working experience in your previous firm and knowledge of job details
  • Q3. Your attitude towards work
  • Q4. Your dedication towards work
Round 3 - HR 

(1 Question)

  • Q1. Last company's experience and salary details

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to upgrade yourself with latest working technology and system you have to join this company

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Q2. What are the methods for managing floods?
  • Q3. What is prestress concrete?
  • Q4. What is Flood Wall?

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why did you have to go through four rounds of interviews?
  • Q2. What is your experience in the oil and gas industry?

Interview Preparation Tips

Interview preparation tips for other job seekers - This company offers positions for both experienced professionals and fresh graduates in the Aramco oil and gas sector.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. This is information to company
  • Q2. This is company sites through
  • Q3. This company is highly growth
  • Q4. This is responsible for the employee
Round 2 - Technical 

(2 Questions)

  • Q1. Bar bending shedule in this question
  • Q2. What are you quality control
  • Ans. 

    Quality control is a process used to ensure that products or services meet specified requirements and standards.

    • Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.

    • It also includes identifying defects or deviations from specifications and taking corrective actions.

    • Quality control helps to prevent defects, improve processes, and enhance customer satisfa...

  • Answered by AI
Round 3 - Group Discussion 

This is company at the high economy

Round 4 - Aptitude Test 

Number system and latter

Round 5 - Coding Test 

On basis of defined structure

Round 6 - One-on-one 

(1 Question)

  • Q1. The information to company
Round 7 - Case Study 

This check the soil testing

Round 8 - Assignment 

This is growth process in the employee

Round 9 - So interested your job profile 

(1 Question)

  • Q1. I like this with company

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. I am fresher and 3 month job in Maharashtra civil site engineer engineer on duty and I am a final year student
Round 2 - Material related 

(4 Questions)

  • Q1. Concrete material
  • Q2. Type of material
  • Ans. 

    Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.

    • Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.

    • Concrete is used for foundations, roads, and structures.

    • Steel is used for beams, columns, and reinforcement.

    • Asphalt is used for roads and pavements.

    • Wood is used for formwork, bridges, and buildings.

    • Aggregates are used in concrete

  • Answered by AI
  • Q3. Material distribution
  • Q4. Normal material

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Surveying and concrete technology

Hi Tech Projects Interview FAQs

How many rounds are there in Hi Tech Projects Senior Civil Site Engineer interview?
Hi Tech Projects interview process usually has 3 rounds. The most common rounds in the Hi Tech Projects interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 3k Interviews
Mphasis Interview Questions
3.4
 • 809 Interviews
Cyient Interview Questions
3.6
 • 283 Interviews
View all

Fast track your campus placements

View all
Hi Tech Projects Senior Civil Site Engineer Salary
based on 5 salaries
₹8.1 L/yr - ₹8.4 L/yr
48% more than the average Senior Civil Site Engineer Salary in India
View more details

Hi Tech Projects Senior Civil Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Planning & Billing Engineer
24 salaries
unlock blur

₹4 L/yr - ₹8.1 L/yr

Safety Officer
22 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Junior Engineer
14 salaries
unlock blur

₹2.9 L/yr - ₹4.5 L/yr

Assistant Engineer
12 salaries
unlock blur

₹3.6 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Hi Tech Projects with

Tech Mahindra

3.5
Compare

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview