Upload Button Icon Add office photos

Filter interviews by

Goyal & Co. Assistant Engineer Interview Questions and Answers

Updated 24 Aug 2024

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Software or tool test

Round 2 - Technical 

(2 Questions)

  • Q1. Related to technical question about fabrication.
  • Q2. Tool related question
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel and shuttering releted questions
Round 3 - HR 

(1 Question)

  • Q1. Expectation releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is very good but management is very bed management was not know how to deal with client and how to deal out staff

I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is blinding? Different types of blinds used in o&g?
  • Ans. 

    Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.

    • Temporary or permanent blinds can be used depending on the situation

    • Common types of blinds include spectacle blinds, paddle blinds, and bleed rings

    • Blinding is often used during maintenance or repair work to ensure safety

    • Blinding can also be used to prevent contamination during storage or transportation

    • Blinding can...

  • Answered by AI
  • Q2. Procedures before starting a work in a refinery equipment,
  • Ans. 

    Before starting work in a refinery equipment, certain procedures must be followed.

    • Obtain a work permit

    • Perform a safety check of the equipment

    • Ensure proper personal protective equipment is worn

    • Verify that all valves are in the correct position

    • Confirm that the equipment is properly grounded

    • Check for any leaks or abnormal conditions

    • Communicate with other workers in the area

    • Follow all established procedures and protocols

  • Answered by AI
  • Q3. What will you do if there's an H2S leak and there's no wind movement,
  • Ans. 

    I will follow the emergency response plan and evacuate the area immediately.

    • Activate the alarm system to alert others in the area

    • Put on personal protective equipment (PPE) including a respirator

    • Evacuate the area immediately and move to a safe location

    • Notify emergency services and follow the emergency response plan

    • Monitor the situation and wait for the all-clear signal before returning to the area

  • Answered by AI
  • Q4. From where you'll advice your workers to start unbloting a heat exchanger head?
  • Ans. 

    I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.

    • Start from the top and work your way down

    • Use appropriate tools and safety equipment

    • Follow proper procedures and guidelines

    • Ensure all bolts are properly labeled and accounted for

    • Inspect the gasket and replace if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, answer what you know.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 2 - HR 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 3 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 4 - One-on-one 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't prefer gaja waste of time
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Related to sourcing basics
Round 2 - Technical 

(1 Question)

  • Q1. They have asked basic of sourcing
Round 3 - HR 

(1 Question)

  • Q1. Discussed on salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is good for GETs
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Discussion about the profile
Round 3 - Technical 

(1 Question)

  • Q1. Site reporting manager ask questions as per core relevants.
Round 4 - Client Interview 

(1 Question)

  • Q1. Ask all technical questions regarding the core relevant areas

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There was 1 interview round.

Round 1 - Group Discussion 

Concerning previous work experience.

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the height of top guard rails,mid rails and toe board rails?
  • Ans. 

    The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.

    • The height of top guard rails is typically between 42 and 45 inches above the walking surface.

    • Mid rails are typically located halfway between the top rail and the walking surface.

    • Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.

    • Specific...

  • Answered by AI
  • Q2. What is safe working load and formula?
  • Ans. 

    Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.

    • SWL is determined by factors such as material strength, design, and intended use.

    • Formula for SWL varies depending on the type of equipment or structure.

    • For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.

    • It is important to always follow the manufacturer's...

  • Answered by AI
  • Q3. Job role and duties of HSE engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and very soon joining offer was given.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel and shuttering releted questions
Round 3 - HR 

(1 Question)

  • Q1. Expectation releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is very good but management is very bed management was not know how to deal with client and how to deal out staff

Goyal & Co. Interview FAQs

How many rounds are there in Goyal & Co. Assistant Engineer interview?
Goyal & Co. interview process usually has 1 rounds. The most common rounds in the Goyal & Co. interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
J&F Interview Questions
3.8
 • 29 Interviews
View all
Goyal & Co. Assistant Engineer Salary
based on 4 salaries
₹2 L/yr - ₹3.6 L/yr
33% less than the average Assistant Engineer Salary in India
View more details
Site Engineer
14 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Civil Site Engineer
13 salaries
unlock blur

₹2 L/yr - ₹5.1 L/yr

Civil Engineer
9 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Project Manager
9 salaries
unlock blur

₹9.6 L/yr - ₹21 L/yr

Senior Engineer
8 salaries
unlock blur

₹4.7 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Goyal & Co. with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview