I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you make RMC reconciliation?
  • Ans. 

    RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.

    • Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.

    • Compare the quantity of RMC ordered with the quantity actually used in construction.

    • Identify any discrepancies and investigate the reasons behind them.

    • Adjust the records accordingly to ensure accurate billing and

  • Answered by AI
  • Q2. How to calculate bbs ?
  • Ans. 

    BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.

    • Calculate the total length of bars required for each diameter and type of reinforcement.

    • Determine the number of bars required for each diameter and type of reinforcement.

    • Calculate the total weight of bars required for each diameter and type of reinforcement.

    • Prepare a detailed schedule...

  • Answered by AI
  • Q3. How to check paint measurements?
  • Ans. 

    Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.

    • Use a paint thickness gauge to measure the thickness of the paint layer.

    • Compare the measured thickness with the specified thickness in the project specifications.

    • Ensure that the paint thickness is uniform across the surface.

    • Repeat the measurements at multiple points to ensure accuracy.

    • Adjust the paint application if...

  • Answered by AI
  • Q4. How do you find extra items for WO amendment?
  • Ans. 

    Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.

    • Review project specifications for any missed items or changes

    • Consult with stakeholders such as architects, engineers, and contractors for input

    • Conduct site visits to identify any additional work required

    • Analyze previous change orders to see if any item

  • Answered by AI
  • Q5. How do you ConsiderJMR is right or wrong?
  • Ans. 

    Consider JMR based on project specifications, quantities, rates, and market conditions.

    • Review project specifications to ensure accurate billing

    • Verify quantities of materials and work done

    • Check rates for labor, materials, and equipment

    • Consider market conditions for pricing accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For billing engineer interview you should practice of bbs and procedures of billing and backup required for billing process!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Rate analysis for plaster
  • Ans. 

    Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.

    • Determine the area to be plastered

    • Calculate the quantity of materials required (cement, sand, water)

    • Determine the cost of materials per unit

    • Calculate the cost of labor per unit area

    • Include the cost of equipment and tools used

    • Add all costs to get the total cost of plastering

    • Example: For plas...

  • Answered by AI
  • Q2. BBS for steel and BOQ for building items
  • Ans. 

    BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.

    • BBS provides details of reinforcement steel required for construction.

    • BOQ lists all the materials and quantities required for construction.

    • BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.

    • BOQ is used for building items like bricks, cement, sand, etc.

    • Both BBS and BOQ are importa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study IS 1200 all parts, material reconciliation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Rate analysis for plaster
  • Ans. 

    Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.

    • Determine the area to be plastered

    • Calculate the quantity of materials required (cement, sand, water)

    • Determine the cost of materials per unit

    • Calculate the cost of labor per unit area

    • Include the cost of equipment and tools used

    • Add all costs to get the total cost of plastering

    • Example: For plas...

  • Answered by AI
  • Q2. BBS for steel and BOQ for building items
  • Ans. 

    BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.

    • BBS provides details of reinforcement steel required for construction.

    • BOQ lists all the materials and quantities required for construction.

    • BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.

    • BOQ is used for building items like bricks, cement, sand, etc.

    • Both BBS and BOQ are importa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study IS 1200 all parts, material reconciliation

Gem Engserv Interview FAQs

How many rounds are there in Gem Engserv Billing Engineer interview?
Gem Engserv interview process usually has 1 rounds. The most common rounds in the Gem Engserv interview process are Technical.
What are the top questions asked in Gem Engserv Billing Engineer interview?

Some of the top questions asked at the Gem Engserv Billing Engineer interview -

  1. How do you find extra items for WO amendme...read more
  2. How do you ConsiderJMR is right or wro...read more
  3. How do you make RMC reconciliati...read more

Tell us how to improve this page.

Gem Engserv Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 3k Interviews
Mphasis Interview Questions
3.4
 • 792 Interviews
Cyient Interview Questions
3.7
 • 281 Interviews
View all
Gem Engserv Billing Engineer Salary
based on 6 salaries
₹5.4 L/yr - ₹7 L/yr
25% more than the average Billing Engineer Salary in India
View more details

Gem Engserv Billing Engineer Reviews and Ratings

based on 3 reviews

3.5/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

2.8

Salary

2.0

Job security

2.8

Company culture

2.8

Promotions

3.5

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
55 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Senior Engineer
24 salaries
unlock blur

₹5.2 L/yr - ₹8.5 L/yr

Safety Officer
22 salaries
unlock blur

₹3.3 L/yr - ₹6.5 L/yr

Assistant Manager - MEP
18 salaries
unlock blur

₹5 L/yr - ₹9.2 L/yr

Civil Engineer
16 salaries
unlock blur

₹3.5 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Gem Engserv with

TCS

3.7
Compare

Wipro

3.7
Compare

Infosys

3.6
Compare

Tech Mahindra

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview