I applied via Walk-in and was interviewed before Jan 2023. There were 2 interview rounds.
Protection scheme in transmission and distribution substations ensures safety and reliability of the electrical system.
Protection scheme is a set of devices and systems designed to detect and isolate faults in the electrical system.
It includes various protective relays, circuit breakers, fuses, and other equipment.
The scheme operates based on principles of fault detection, fault isolation, and fault clearance.
Different...
Single line diagram shows electrical distribution system in simplified form. Circuit breaker schemes depict arrangement of circuit breakers in system.
Single line diagram is a simplified representation of electrical distribution system showing how various components are connected.
It includes power sources, loads, transformers, circuit breakers, etc. with lines indicating connections.
Circuit breaker schemes show arrangem...
CT, PT, and CVT are electrical equipment used in power systems for measurement and protection purposes.
CT stands for Current Transformer, which is used to measure and step down high currents to a safe level for measurement or protection devices.
PT stands for Potential Transformer, which is used to measure and step down high voltages to a safe level for measurement or protection devices.
CVT stands for Capacitive Voltage...
Different types of transformers used in substations include power transformers, distribution transformers, and instrument transformers.
Power transformers are used to step up or step down voltage for transmission and distribution purposes.
Distribution transformers are used to supply lower voltage to end users.
Instrument transformers include current transformers and voltage transformers used for metering and protection p...
Various tests are performed on transformers, CTs, and breakers to ensure their proper functioning and safety.
Insulation resistance test to check for any insulation breakdown
Turns ratio test to verify the turns ratio of the transformer
Polarity test to confirm correct polarity
CT ratio test to ensure the current ratio is accurate
Contact resistance test on breakers to check for any loose connections
Timing test on breakers ...
In case of an emergency in a substation, I would follow established safety protocols and procedures to ensure the safety of personnel and equipment.
Immediately notify the appropriate authorities and emergency services
Evacuate personnel from the affected area to a safe location
Isolate the affected equipment to prevent further damage
Implement contingency plans to maintain power supply if possible
Coordinate with relevant ...
Top trending discussions
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
I am a dedicated professional with strong leadership skills and a passion for team development and operational excellence.
Background: I have over 5 years of experience in management roles, focusing on team leadership and project execution.
Skills: Proficient in data analysis and strategic planning, which helped my previous team increase productivity by 20%.
Leadership: I believe in empowering my team members, as demonstr...
I appeared for an interview in Sep 2020.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
I expect a supportive environment that fosters growth, collaboration, and clear communication to achieve our shared goals.
Professional Development: I hope for opportunities for training and skill enhancement, such as workshops or mentorship programs.
Open Communication: I value a culture where feedback is encouraged, allowing for constructive discussions and continuous improvement.
Team Collaboration: I expect a collabor...
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
I am a dedicated professional with a strong academic background, eager to contribute to your organization’s success and growth.
My name is [Your Name], and I hold a degree in [Your Qualification].
I am drawn to your organization because of its commitment to innovation and excellence in the industry.
I admire your company’s values, particularly [specific value], which aligns with my personal and professional beliefs.
I beli...
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I appeared for an interview in Apr 2025, where I was asked the following questions.
I am a dedicated professional with strong leadership skills and a passion for team development and operational excellence.
I have over 5 years of experience in management roles, leading teams to achieve their goals.
In my previous role, I successfully increased team productivity by 20% through effective training and motivation.
I am skilled in conflict resolution, having mediated several team disputes to maintain a positi...
The store process involves inventory management, sales transactions, customer service, and restocking procedures.
Inventory Management: Keeping track of stock levels to avoid shortages or overstock.
Sales Transactions: Processing customer purchases efficiently at the point of sale.
Customer Service: Assisting customers with inquiries and ensuring a positive shopping experience.
Restocking Procedures: Regularly replenishing...
Some of the top questions asked at the GE Vernova T&D India Project Site Incharge interview -
based on 1 interview experience
Difficulty level
Duration
Project Manager
42
salaries
| ₹6.5 L/yr - ₹23.8 L/yr |
Site Manager
30
salaries
| ₹5.2 L/yr - ₹13 L/yr |
Assistant Manager
23
salaries
| ₹5.5 L/yr - ₹12.8 L/yr |
Quality Engineer
21
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Project Engineer
20
salaries
| ₹2.2 L/yr - ₹9 L/yr |
Adani Power
Adani Green Energy
ReNew
Vestas