Project Site Incharge

10+ Project Site Incharge Interview Questions and Answers

Updated 30 Jan 2025
search-icon

Q1. What will you do if work is carried in area where light fluctuation is random and light is must for completing the work

Ans.

I will take proactive measures to ensure uninterrupted power supply and implement alternative lighting solutions.

  • Assess the current lighting system and identify the cause of light fluctuation

  • Install voltage stabilizers or regulators to minimize the impact of random light fluctuations

  • Implement backup power sources such as generators or UPS systems

  • Utilize portable lighting solutions like battery-powered lamps or rechargeable LED lights

  • Ensure proper maintenance of lighting equip...read more

Q2. What do you know about CT, PT and CVT with breif description of each equipment?

Ans.

CT, PT, and CVT are electrical equipment used in power systems for measurement and protection purposes.

  • CT stands for Current Transformer, which is used to measure and step down high currents to a safe level for measurement or protection devices.

  • PT stands for Potential Transformer, which is used to measure and step down high voltages to a safe level for measurement or protection devices.

  • CVT stands for Capacitive Voltage Transformer, which is used to measure high voltages and p...read more

Q3. What do you know about single line diagram and circuit Breaker schemes?

Ans.

Single line diagram shows electrical distribution system in simplified form. Circuit breaker schemes depict arrangement of circuit breakers in system.

  • Single line diagram is a simplified representation of electrical distribution system showing how various components are connected.

  • It includes power sources, loads, transformers, circuit breakers, etc. with lines indicating connections.

  • Circuit breaker schemes show arrangement of circuit breakers in system to protect equipment and...read more

Q4. What do you know about type of Transformer along with the application in substation?

Ans.

Different types of transformers used in substations include power transformers, distribution transformers, and instrument transformers.

  • Power transformers are used to step up or step down voltage for transmission and distribution purposes.

  • Distribution transformers are used to supply lower voltage to end users.

  • Instrument transformers include current transformers and voltage transformers used for metering and protection purposes.

  • Examples: Power transformer - 220 kV/33 kV, Distri...read more

Are these interview questions helpful?

Q5. What type of test perform in Transformer , CT and breakers?

Ans.

Various tests are performed on transformers, CTs, and breakers to ensure their proper functioning and safety.

  • Insulation resistance test to check for any insulation breakdown

  • Turns ratio test to verify the turns ratio of the transformer

  • Polarity test to confirm correct polarity

  • CT ratio test to ensure the current ratio is accurate

  • Contact resistance test on breakers to check for any loose connections

  • Timing test on breakers to verify the operation time

Q6. What do you know about protection scheme of Transmission and distribution of Substation

Ans.

Protection scheme in transmission and distribution substations ensures safety and reliability of the electrical system.

  • Protection scheme is a set of devices and systems designed to detect and isolate faults in the electrical system.

  • It includes various protective relays, circuit breakers, fuses, and other equipment.

  • The scheme operates based on principles of fault detection, fault isolation, and fault clearance.

  • Different types of protection schemes are used for transmission and...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. How you will deal the emergency situation in substation?

Ans.

In case of an emergency in a substation, I would follow established safety protocols and procedures to ensure the safety of personnel and equipment.

  • Immediately notify the appropriate authorities and emergency services

  • Evacuate personnel from the affected area to a safe location

  • Isolate the affected equipment to prevent further damage

  • Implement contingency plans to maintain power supply if possible

  • Coordinate with relevant stakeholders for support and assistance

Q8. How will you carried out work if labour is less than required and also expensive

Ans.

To carry out work with less and expensive labor, I would focus on optimizing processes, leveraging technology, and outsourcing certain tasks.

  • Optimize processes to maximize efficiency and productivity

  • Implement technology solutions to automate tasks and reduce labor requirements

  • Outsource certain tasks to external contractors or agencies

  • Prioritize tasks and allocate available labor resources effectively

  • Train existing labor to multi-task and handle multiple responsibilities

  • Negoti...read more

Q9. What is the role of communication in Programmable Logic Controllers (PLC) and industrial automation?

Ans.

Communication in PLC and industrial automation is crucial for transmitting data, commands, and feedback between different components.

  • Communication allows PLCs to receive input signals from sensors and transmit output signals to actuators.

  • PLCs can communicate with other devices such as Human Machine Interfaces (HMIs) or Supervisory Control and Data Acquisition (SCADA) systems.

  • Communication protocols like Modbus, Profibus, and Ethernet/IP are commonly used in industrial automat...read more

Q10. How can one effectively communicate using input and output signals?

Ans.

Effective communication using input and output signals involves clear and concise messaging to ensure accurate transmission of information.

  • Ensure that the input signals are clearly understood by the recipient

  • Use appropriate output signals to convey the intended message

  • Confirm receipt and understanding of the message to avoid miscommunication

Q11. What is the Cement Consumption in PCC 1:4:8 Mix? Ans. 2. 3.6 Bags

Ans.

The cement consumption in PCC 1:4:8 mix is 3.6 bags.

  • Cement consumption is calculated based on the volume of concrete mix and the ratio of cement in the mix.

  • For PCC 1:4:8 mix, the ratio means 1 part cement, 4 parts sand, and 8 parts aggregate.

  • Therefore, in a PCC 1:4:8 mix, the cement consumption is 3.6 bags.

Q12. What is the consumption of bags of cement in a 1:1.5:3 concrete mix Ans. 1. 8 Bags

Ans.

The consumption of bags of cement in a 1:1.5:3 concrete mix is 8 bags.

  • In a 1:1.5:3 concrete mix, the ratio represents the proportion of cement, sand, and aggregate respectively.

  • For every 1 part of cement, there are 1.5 parts of sand and 3 parts of aggregate.

  • Therefore, in a 1:1.5:3 mix, the total parts would be 1+1.5+3 = 5.5 parts.

  • To calculate the number of bags of cement needed, divide the total parts by the part of cement (1) and multiply by the total volume of concrete need...read more

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Project Site Incharge Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter