I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
Chapter 12 in design focuses on project management and implementation.
Chapter 12 covers topics such as project planning, scheduling, budgeting, and risk management.
It also discusses the importance of communication and collaboration within a design team.
Examples of tools and techniques for project management in design include Gantt charts, critical path method, and agile methodologies.
The kg/m2 of a normal building varies depending on factors such as materials used, height, and purpose.
The kg/m2 of a normal building can range from 150 to 400 kg/m2.
Factors such as the type of construction materials, height of the building, and purpose (residential, commercial, industrial) can affect the kg/m2.
For example, a steel-framed commercial building may have a higher kg/m2 compared to a wood-framed residential
Top trending discussions
I appeared for an interview in Jul 2020.
I applied via Naukri.com and was interviewed before Mar 2021. There were 4 interview rounds.
Technical questions related to domain.
Carbonation is the process of dissolving carbon dioxide gas in a liquid.
Occurs naturally in carbonated mineral water
Used in the production of carbonated beverages
Can affect the pH of a liquid
Can cause corrosion in concrete structures
Pratical test by Auto level.
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Test based on basic Mining knowledge
I applied via Recruitment Consultant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview before Feb 2024.
Aptitude questions with main sub questions
posted on 15 Dec 2023
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
173
salaries
| ₹4 L/yr - ₹17 L/yr |
Production Engineer
83
salaries
| ₹2.7 L/yr - ₹6.8 L/yr |
Senior Sales Officer
76
salaries
| ₹3.6 L/yr - ₹8.5 L/yr |
Deputy Manager
61
salaries
| ₹7.1 L/yr - ₹18.7 L/yr |
Sales Officer
60
salaries
| ₹3 L/yr - ₹6.8 L/yr |
JK Cement
ACC
Shree Cement
Dalmia Bharat Cement