i
Escorts Kubota Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
First angle projection and third angle projection are two different methods used in technical drawing to represent a 3D object on a 2D plane.
First angle projection is commonly used in Europe and Asia, where the object is imagined to be in the first quadrant (between the object and the observer).
Third angle projection is predominantly used in North America, where the object is imagined to be in the third quadrant (behin...
Supply Chain Management (SCM) involves the coordination and optimization of all activities involved in the sourcing, procurement, production, and logistics of a product.
SCM focuses on the efficient flow of goods and services from the point of origin to the point of consumption.
It includes planning, sourcing, making, delivering, and returning products in a way that maximizes customer value and achieves a competitive adv...
Top trending discussions
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
Inventory control is the process of managing and overseeing the ordering, storage, and usage of a company's inventory.
It involves tracking inventory levels, forecasting demand, and ensuring efficient use of resources.
Inventory control helps prevent stockouts, reduce carrying costs, and optimize inventory turnover.
Examples include implementing barcode systems, setting reorder points, and conducting regular inventory aud
Material handling involves the movement, protection, storage, and control of materials throughout the manufacturing, distribution, consumption, and disposal stages.
Involves the movement of materials from one location to another
Includes activities such as loading, unloading, storing, and transporting materials
Focuses on maximizing efficiency and minimizing costs in the handling process
Utilizes equipment like forklifts, ...
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Create a detailed manpower plan based on workload and skill requirements
Communicate clearly with employees about their roles, responsibilities, and expectations
Provide regular training and development opportunities to enhance skills and knowledge
Motivate employees through recognition, rewards, and a positive work environment
...
Material handling equipment refers to tools and machinery used to move, protect, store, and control materials throughout the manufacturing process.
Includes equipment like forklifts, conveyors, pallet jacks, and cranes
Improves efficiency and safety in handling materials
Reduces manual labor and potential for injuries
Essential for warehouses, distribution centers, and manufacturing facilities
FIFO stands for First In, First Out. GRN stands for Goods Receipt Note. SAP is an enterprise resource planning software. Shortage refers to a deficiency in inventory.
FIFO is a method of inventory management where the first items purchased are the first ones sold or used.
GRN is a document used to confirm the receipt of goods from a supplier.
SAP is a software system used by companies for managing various aspects of their...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
The major cost driver in wiring harness is the cost of raw materials, labor, and complexity of the design.
Cost of raw materials such as copper wires and connectors
Labor costs for assembly and installation
Complexity of the design impacting production time and skill level required
Volume of production affecting economies of scale
I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.
I was interviewed in Jan 2023.
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2018. There were 3 interview rounds.
Interview experience
Assistant Manager
1.1k
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Manager
528
salaries
| ₹5.2 L/yr - ₹17.2 L/yr |
Diploma Trainee Engineer
498
salaries
| ₹1.4 L/yr - ₹2.8 L/yr |
Executive
280
salaries
| ₹1.7 L/yr - ₹7.5 L/yr |
Senior Manager
279
salaries
| ₹8 L/yr - ₹25 L/yr |
Mahindra & Mahindra
Tata Motors
Ashok Leyland
Bharat Forge