I applied via Company Website and was interviewed in Jan 2022. There were 4 interview rounds.
ASME code specifies materials and technical specifications for fittings. Various fitting tools are used for installation.
ASME code provides guidelines for materials used in fittings
Technical specifications include dimensions, tolerances, and testing requirements
Fitting tools include wrenches, pliers, pipe cutters, and threaders
Proper use of fitting tools is important for safe and efficient installation
Handling Manpower at the site and Coordination to Clint
Top trending discussions
I applied via Referral and was interviewed in Sep 2023. There were 3 interview rounds.
General aptitude test
Various types of materials can be used in ceilings, including drywall, acoustic tiles, wood, metal, and plaster.
Drywall is a common material used in ceilings for its affordability and ease of installation.
Acoustic tiles are often used in commercial buildings to improve sound insulation.
Wood ceilings can add a warm and natural aesthetic to a space.
Metal ceilings are durable and easy to clean, making them suitable for hi...
The command to measure area distance in AutoCAD is MEASUREGEOM.
Open AutoCAD and go to the 'Home' tab.
Click on the 'Measure' tool in the 'Utilities' panel.
Select 'Distance' or 'Area' depending on what you want to measure.
Click on the points you want to measure and the result will be displayed.
Alternatively, you can use the MEASUREGEOM command and follow the prompts.
BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.
BOQ is a detailed list of items, with quantities and prices, required for a construction project.
It helps in estimating the total cost of the project and serves as a basis for tendering and budgeting.
BOQ is typically prepared by quantity surveyors or estimators.
Example: A BOQ...
QS and Rate Card are documents used in construction projects to determine the quantity surveying and rates of items in civil electrical and HVAC work.
Quantity Surveying (QS) involves calculating the quantities of materials needed for a project.
Rate Card is a document that lists the rates of different items used in construction work.
For example, the QS for electrical work would include the quantity of wires, switches, a...
The rate for a new item is decided based on market research, production costs, competition, and desired profit margin.
Conduct market research to understand pricing trends and customer preferences
Calculate production costs including materials, labor, and overhead expenses
Consider competition pricing to ensure competitiveness in the market
Determine desired profit margin to set the final rate
Adjust pricing based on feedba
LOA stands for Letter of Authorization and PO stands for Purchase Order.
LOA is a document that authorizes a person or entity to act on behalf of another.
PO is a commercial document issued by a buyer to a seller, indicating types, quantities, and agreed prices for products or services.
Both LOA and PO are commonly used in business transactions to formalize agreements and authorize actions.
posted on 4 Oct 2023
posted on 13 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 4 interview rounds.
Case study related to project management
Deputy Manager
157
salaries
| ₹6 L/yr - ₹20 L/yr |
Senior Manager
133
salaries
| ₹18 L/yr - ₹42 L/yr |
Senior Engineer
97
salaries
| ₹5.5 L/yr - ₹12.5 L/yr |
Piping Designer
93
salaries
| ₹4 L/yr - ₹15.9 L/yr |
Civil Engineer
83
salaries
| ₹3 L/yr - ₹8.4 L/yr |
BHEL
Oil And Natural Gas Corporation
Hindustan Petroleum
GAIL