i
Endurance Technologies
Filter interviews by
Measurement System Analysis is a method used to evaluate the measurement process to ensure accuracy and reliability.
It involves assessing the precision, accuracy, and stability of measurement systems.
Common methods include Gage R&R (Repeatability and Reproducibility) studies and calibration.
The goal is to identify and eliminate sources of variation in the measurement process.
Example: Conducting a Gage R&R study on a me...
The 7 QC Tools are a set of basic tools used for quality control and problem-solving in manufacturing and other industries.
Check sheets: Used to collect and organize data in a systematic way.
Histograms: Used to show the frequency distribution of a set of data.
Pareto charts: Used to prioritize problems or causes based on their frequency or impact.
Cause-and-effect diagrams (Fishbone diagrams): Used to identify and analyz...
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Referral and was interviewed in Apr 2018. There were 2 interview rounds.
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
What kind of behavior for workers
Process actives are steps or tasks involved in completing a specific process.
Identify all the steps involved in the process
List the tasks in sequential order
Define the inputs and outputs of each step
Assign responsibilities for each task
Monitor progress and adjust as needed
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
based on 3 interviews
Interview experience
Senior Engineer
507
salaries
| ₹2 L/yr - ₹8 L/yr |
Assistant Manager
293
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Executive
266
salaries
| ₹4 L/yr - ₹10 L/yr |
Quality Engineer
221
salaries
| ₹1.1 L/yr - ₹4.8 L/yr |
Senior Production Engineer
149
salaries
| ₹2.6 L/yr - ₹7 L/yr |
JBM Group
Subros
TVS Sundram Fasteners
Spark Minda