Filter interviews by
Clear (1)
Kikar is used as a support system in Mivan shuttering to provide stability and strength to the formwork structure.
Kikar is a type of wooden support used in Mivan shuttering to hold the formwork panels in place.
It helps in maintaining the shape and alignment of the formwork during concrete pouring.
Kikar supports are placed at regular intervals to ensure the formwork can withstand the pressure of the concrete.
They are es...
Top trending discussions
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.
SFD & BMD for a simply supported load
SFD is a diagram that shows the variation of shear force along the length of a beam
BMD is a diagram that shows the variation of bending moment along the length of a beam
For a simply supported load, the SFD will be a straight line with a constant slope
The BMD will be a parabolic curve with the maximum value at the center of the beam
The SFD and BMD can be calculated using equations an
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
The budget of the previous project was $1.5 million.
The budget for the previous project was $1.5 million.
It was allocated for construction materials, labor costs, and equipment rental.
The budget was carefully monitored to ensure it was not exceeded.
Any deviations from the budget were documented and analyzed for future reference.
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
Reinforcement quantity for beam, slab, column, and tiles wastage calculations involve determining the amount of materials needed and accounting for potential wastage.
Calculate the required quantity of reinforcement for beams, slabs, columns, and tiles based on structural drawings and specifications.
Consider the standard lengths and sizes of reinforcement bars available in the market to minimize wastage.
Factor in the cu...
I applied via Campus Placement and was interviewed before Jan 2022. There were 2 interview rounds.
Assistant Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
PRE Sales Executive
13
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group