I applied via Walk-in and was interviewed before Jul 2023. There were 3 interview rounds.
General maths, logical reasoning
I will execute the structures by following the design plans, coordinating with various teams, ensuring quality control, and adhering to safety regulations.
Follow the design plans provided by the structural engineers
Coordinate with other teams such as architects, contractors, and subcontractors
Ensure quality control throughout the construction process
Adhere to safety regulations and standards
Regularly inspect the constr...
Some hurdles in execution include delays, budget constraints, unforeseen site conditions, and coordination issues.
Delays in obtaining permits or approvals
Budget constraints leading to value engineering or scope reductions
Unforeseen site conditions such as poor soil quality or environmental issues
Coordination issues with subcontractors or other project stakeholders
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
Written/Aptitude test: The first round for most of the companies is written round. ...
Concrete batch time affects the temperature of heat produced during the curing process.
The batch time of concrete refers to the duration for which the concrete ingredients are mixed together.
A longer batch time can lead to higher temperatures being produced during the curing process.
The heat generated during curing is important as it affects the strength and durability of the concrete.
Proper monitoring and control of b...
Types of footing include spread footings, mat foundations, pile foundations, and drilled caissons.
Spread footings are used for shallow foundations and distribute the load over a larger area.
Mat foundations are used for heavy loads and distribute the load over a larger area.
Pile foundations are used when soil conditions are poor and transfer the load to deeper, more stable soil layers.
Drilled caissons are used for heavy...
Yes, bricks absorb water due to their porous nature.
Bricks have small pores that allow water to seep in.
Water absorption can lead to deterioration of bricks over time.
Bricks with high absorption rates may not be suitable for certain climates or applications.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
I appeared for an interview in Feb 2023.
Self introduction, previous experience of working.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph of shear force plotted against the length of the beam.
Bending moment diagram is a graph of bending moment plotted against the length of the beam.
Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...
Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.
Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.
It includes factors such as type of material, dimensions, quality standards, and wastage allowances.
For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring new opportunities for career advancement.
Seeking a company with a better cultural fit or work-life balance.
Want to work on more innovative projects or in a different industry.
Previous company downsized or restructured, leading to job loss.
I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.
Implemented best practices in engineering processes and project management
Fostered a culture of continuous improvement through regular training and feedback sessions
Ensured alignment with industry standards and certifications such as ISO, ASME, or API
Regul...
I manage projects by setting clear goals, creating a detailed plan, delegating tasks effectively, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed project plan outlining tasks, timelines, and resources
Delegate tasks to team members based on their strengths and expertise
Monitor progress regularly and address any issues or delays promptly
Adjust the project plan
I applied via Job Portal and was interviewed in Sep 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
173
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Senior Manager
121
salaries
| ₹10 L/yr - ₹30 L/yr |
Assistant General Manager
109
salaries
| ₹16.5 L/yr - ₹36 L/yr |
Deputy Manager
103
salaries
| ₹7.2 L/yr - ₹15 L/yr |
Manager
82
salaries
| ₹8 L/yr - ₹20.2 L/yr |
Sobha
Godrej Properties
Surya Roshni
Emaar India Limited