Upload Button Icon Add office photos

Filter interviews by

Divya Construction Site Engineer Interview Questions and Answers

Updated 15 May 2022

Divya Construction Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 15 May 2022

I applied via Company Website and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. No.of bricks in M^3 Unit of cubic test Procedure of cube test BBS.etc
  • Ans. 

    The interview question is about the number of bricks in a cubic meter, cube test procedure, and BBS.

    • The number of bricks in a cubic meter varies depending on the size of the brick.

    • The cube test is used to determine the compressive strength of concrete.

    • BBS stands for Bar Bending Schedule and is used to determine the quantity of steel required for a construction project.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep confidence level high. Solve each questions with keeping patience .

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Columns staircase foundation
  • Q2. Beam one way slab ,two way slav
  • Ans. 

    One way slab is supported on two opposite sides, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads predominantly in one direction.

    • Two way slab is designed to carry loads in both directions.

    • One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.

    • Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Site related experience bracket wall
  • Q2. Survey auto level total station
Round 3 - One-on-one 

(2 Questions)

  • Q1. Bbs, drawing reading
  • Q2. Stairs drawing reading
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is CBR value
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete workebility test
  • Ans. 

    Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.

  • Answered Anonymously
  • Q2. Concrete strength
  • Q3. Suttring work .safety working at site
  • Q4. Gas pipeline work
  • Ans. 

    Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.

    • Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.

    • Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.

    • Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...

  • Answered by AI
  • Q5. Auto level work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly work done
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Practical work related question, Civil engineering related question
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Cement density and aggregate
  • Q2. Cement set time

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company NCC LIMITED
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is your salary.
  • Q2. Doing all over project.
  • Q3. Notice period of your current company
Round 3 - Technical 

(4 Questions)

  • Q1. Cement consumption of M20 ratio
  • Ans. 

    Cement consumption of M20 concrete mix ratio is 360 kg/m3.

    • M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)

    • Cement consumption for 1 m3 of M20 concrete is 360 kg

    • To calculate total cement consumption, multiply 360 kg by the volume of concrete needed

  • Answered by AI
  • Q2. Extra item add in billing.
  • Ans. 

    Extra items added in billing should be justified with proper documentation and approval.

    • Ensure that the extra item was actually used on the project

    • Check if the extra item was approved by the client or project manager

    • Document the reason for adding the extra item in the billing

    • Provide evidence such as photos or receipts to support the inclusion of the extra item

  • Answered by AI
  • Q3. Rate analysis of various item
  • Ans. 

    Rate analysis involves calculating the cost of various items in a construction project.

    • Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.

    • It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.

    • Rate analysis is essential for accurate budgeting and cost estimation in construction projects.

    • For example, in...

  • Answered by AI
  • Q4. Price ecclaration

Divya Construction Interview FAQs

How many rounds are there in Divya Construction Site Engineer interview?
Divya Construction interview process usually has 1 rounds. The most common rounds in the Divya Construction interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Divya Construction interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Divya Construction Site Engineer Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

3.3

Promotions/Appraisal

5.0

Work Satisfaction

Explore 3 Reviews and Ratings
Project Manager
5 salaries
unlock blur

₹4 L/yr - ₹10 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2.5 L/yr - ₹3 L/yr

Accountant
4 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Marketing Executive
4 salaries
unlock blur

₹2.1 L/yr - ₹2.1 L/yr

Assistant Project Manager
3 salaries
unlock blur

₹4.8 L/yr - ₹6.8 L/yr

Explore more salaries
Compare Divya Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview