I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
The interview question is about the number of bricks in a cubic meter, cube test procedure, and BBS.
The number of bricks in a cubic meter varies depending on the size of the brick.
The cube test is used to determine the compressive strength of concrete.
BBS stands for Bar Bending Schedule and is used to determine the quantity of steel required for a construction project.
Top trending discussions
I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.
One way slab is supported on two opposite sides, while two way slab is supported on all four sides.
One way slab is designed to carry loads predominantly in one direction.
Two way slab is designed to carry loads in both directions.
One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.
Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag
I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.
A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.
Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.
The prop helps to reduce the bending moment and deflection at the free end of the beam.
These beams are commonly used in construction to support overhanging structures or balconies.
Example...
The beam with the highest thickness will depend on the specific design and requirements of the structure.
The beam with the highest thickness will typically be a main load-bearing beam in the structure.
Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.
For example, a bridge beam supporting heavy traffic will likely have a higher thickness than
posted on 27 Sep 2024
I was interviewed in Aug 2024.
Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.
Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.
Steel is durable and resistant to corrosion, ensuring the longevity of structures.
Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.
Steel is cost-effec...
Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.
Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.
It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.
Proper concrete cover helps in maintaining the durability and streng...
Calculate the amount of steel required for a staircase based on design and dimensions.
Calculate the total length of all the steel bars needed for the staircase
Determine the diameter and spacing of the steel bars based on design requirements
Consider the number of steps and the dimensions of the staircase in the calculation
Account for any additional reinforcement needed for structural integrity
Consult structural drawings
Concrete workability can be determined by conducting a slump test.
Conduct a slump test to measure the consistency of the concrete mix.
Adjust the water content or use admixtures to achieve the desired workability.
Consider factors such as temperature, humidity, and type of aggregates in determining workability.
Consult with concrete mix design experts for guidance on achieving the desired workability.
Use tools like flow t...
Slump test is a method to measure the consistency of concrete before it sets.
Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.
The test helps ensure the concrete is of the right consistency for proper placement and compaction.
Slump tes...
Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.
Involves selecting the right combination of materials like cement, aggregates, water, and admixtures
Proportions are determined based on desired strength, workability, durability, and other properties
Testing and adjusting the mix design to meet project requirements
Example: A ...
Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.
Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.
Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.
Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.
Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...
posted on 15 Jun 2024
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
posted on 16 Jun 2024
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Cement consumption of M20 concrete mix ratio is 360 kg/m3.
M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Cement consumption for 1 m3 of M20 concrete is 360 kg
To calculate total cement consumption, multiply 360 kg by the volume of concrete needed
Extra items added in billing should be justified with proper documentation and approval.
Ensure that the extra item was actually used on the project
Check if the extra item was approved by the client or project manager
Document the reason for adding the extra item in the billing
Provide evidence such as photos or receipts to support the inclusion of the extra item
Rate analysis involves calculating the cost of various items in a construction project.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.
Rate analysis is essential for accurate budgeting and cost estimation in construction projects.
For example, in...
based on 3 reviews
Rating in categories
Project Manager
5
salaries
| ₹4 L/yr - ₹10 L/yr |
Civil Site Engineer
5
salaries
| ₹2.5 L/yr - ₹3 L/yr |
Accountant
4
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Marketing Executive
4
salaries
| ₹2.1 L/yr - ₹2.1 L/yr |
Assistant Project Manager
3
salaries
| ₹4.8 L/yr - ₹6.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd