Filter interviews by
Clear (1)
I applied via Company Website and was interviewed before Oct 2021. There were 5 interview rounds.
Earth work to bearing surface work PQC, DLC, WMM, GSB ,TURFING, RE WALL
Good site work assignment .work experience asking clearly.
The question is incomplete and lacks context.
The question needs more information to provide a proper answer.
It is unclear what grader and poclane machine refer to.
Without additional details, it is impossible to determine the output of either machine.
Soil mechanism in road refers to the behavior of soil under traffic loads. CBR value of embodiment and subgrade are important factors.
Soil mechanism in road is the study of how soil behaves under the weight of traffic loads.
CBR (California Bearing Ratio) value is a measure of the strength of the soil.
The CBR value of the embodiment layer should be at least 30% and the subgrade layer should be at least 10%.
The CBR value...
Top trending discussions
posted on 28 Dec 2023
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 26 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
posted on 14 Jul 2017
I was interviewed before Jul 2016.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 4 May 2019
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
I was interviewed in Mar 2023.
based on 8 reviews
Rating in categories
Senior Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
207
salaries
| ₹0 L/yr - ₹0 L/yr |
Asst Store
201
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
193
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
178
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech