Upload Button Icon Add office photos

Dilip Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Dilip Buildcon Construction Management Interview Questions and Answers for Experienced

Updated 22 Jul 2024

Dilip Buildcon Construction Management Interview Experiences for Experienced

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. How many chambers are there in an OHT
  • Ans. 

    There are typically two chambers in an overhead tank (OHT).

    • Most OHTs have two chambers - one for storing water and one for controlling the water level.

    • The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.

    • Having two chambers helps in maintaining a consistent water supply and pressure in the tank.

  • Answered by AI
  • Q2. What is the concrete and reinforcement quantity in an OHT
  • Ans. 

    The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.

    • Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.

    • Reinforcement quantity is determined by the structural design requirements for strength and durability.

    • Factors such as load capacity, water pressure, and seismic considerations also impa...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your Expected CTC
  • Ans. 

    My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.

    • My expected CTC is based on industry standards and my level of experience.

    • I am open to discussing the compensation package during the interview process.

    • I am looking for a competitive salary that reflects my skills and contributions to the company.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What About yourself
  • Q2. About your knowledge

Construction Management Interview Questions Asked at Other Companies for Experienced

Q1. What are the different issues(technical & administrative) fac ... read more
Q2. How much of quantity of piping done at ur location and the total ... read more
Q3. Viscosity of polymer before starting the pile boring, what is the ... read more
Q4. Types of valves, hydrotesting pressure in pipe lines, Units of pr ... read more
Q5. How would you handle a situation if any labor payment issues aris ... read more

Construction Management Jobs at Dilip Buildcon

View all

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About basic construction ideas

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge on construction activities and managerial skills.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected
  • Q1. What is a construction site management system?
  • Ans. 

    A construction site management system coordinates resources, schedules, and safety protocols to ensure efficient project execution.

    • Facilitates project planning and scheduling, e.g., Gantt charts for timeline management.

    • Tracks resource allocation, such as labor, materials, and equipment.

    • Enhances communication among stakeholders, including contractors, subcontractors, and clients.

    • Implements safety management protocols to...

  • Answered by AI
  • Q2. What is the process for estimation and cost analysis?
  • Ans. 

    Estimation and cost analysis in construction involves assessing project costs and resources for effective budgeting and planning.

    • Define project scope: Clearly outline the project's objectives and deliverables.

    • Gather historical data: Use past project costs as a benchmark for estimation.

    • Break down tasks: Divide the project into smaller tasks for detailed cost analysis.

    • Estimate costs: Calculate direct and indirect costs, ...

  • Answered by AI
  • Q3. What knowledge do you have regarding team leadership?
  • Ans. 

    Effective team leadership in construction involves communication, motivation, and conflict resolution to achieve project goals.

    • Clear Communication: Ensuring all team members understand project goals and their roles. For example, holding regular briefings.

    • Motivation: Encouraging team members through recognition and support. For instance, celebrating milestones to boost morale.

    • Conflict Resolution: Addressing disputes pro...

  • Answered by AI
  • Q4. Problem solving quick learning knowledge
  • Q5. *****

Interview Questionnaire 

1 Question

  • Q1. Sequence of toilets finishes
  • Ans. 

    The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.

    • The first step is usually to install the plumbing and drainage system for the toilet.

    • Next, the walls and floors are prepared and waterproofed.

    • After that, the fixtures such as toilets, sinks, and urinals are installed.

    • Following the installation of fixtures, the walls a...

  • Answered by AI

I appeared for an interview before Jul 2021.

Round 1 - Technical 

(1 Question)

  • Q1. Mechanical Piping & Structural basis
Round 2 - HR 

(1 Question)

  • Q1. Expected CTC, How much favoured you this company if we are hiring to you

Interview Preparation Tips

Interview preparation tips for other job seekers - Just focused on your resume what is the content added in it & prepared the same subject to crack that

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About reconciliation of steel

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good but till last round they call upto payment negotiations then they hold suddenly

I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me the best thing you have done in your previous project.
  • Q2. Tell me your achievement.
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and notice period required to join the organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through the profile properly. Some profile needs efforts. They will give good salary also. You need to show your competency while working in TPL.

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon Construction Management interview for experienced candidates?
Dilip Buildcon interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the Dilip Buildcon interview process for experienced candidates are One-on-one Round, Technical and HR.
How to prepare for Dilip Buildcon Construction Management interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Construction Management, Bridges, Civil Project Management, Construction Supervision and Estimation.
What are the top questions asked in Dilip Buildcon Construction Management interview for experienced candidates?

Some of the top questions asked at the Dilip Buildcon Construction Management interview for experienced candidates -

  1. What is the concrete and reinforcement quantity in an ...read more
  2. How many chambers are there in an ...read more
  3. What is your Expected ...read more

Tell us how to improve this page.

Dilip Buildcon Construction Management Interview Process for Experienced

based on 2 interviews

Interview experience

5
  
Excellent
View more

Fast track your campus placements

View all
Dilip Buildcon Construction Management Salary
based on 87 salaries
₹9.6 L/yr - ₹23.7 L/yr
10% less than the average Construction Management Salary in India
View more details

Dilip Buildcon Construction Management Reviews and Ratings

based on 17 reviews

3.3/5

Rating in categories

2.4

Skill development

2.9

Work-life balance

3.2

Salary

2.5

Job security

2.3

Company culture

2.3

Promotions

3.0

Work satisfaction

Explore 17 Reviews and Ratings
Senior Engineer
210 salaries
unlock blur

₹4 L/yr - ₹10.9 L/yr

Assistant Manager
209 salaries
unlock blur

₹4 L/yr - ₹12.1 L/yr

Asst Store
206 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Store Executive
190 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Structural Engineer
179 salaries
unlock blur

₹2 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Dilip Buildcon with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview