Filter interviews by
I appeared for an interview in Oct 2022.
To improve packer TPH, we can focus on optimizing the packing process and equipment.
Analyze the current packing process and identify bottlenecks
Implement lean manufacturing principles to eliminate waste and improve efficiency
Invest in modern packing equipment to increase speed and accuracy
Train packers on proper techniques to minimize errors and reduce downtime
Regularly monitor and measure TPH to track progress and ide
Regular maintenance, proper training of staff, and use of quality equipment can reduce breakdown maintenance.
Implement a preventive maintenance program
Train staff on proper use and maintenance of equipment
Use high-quality equipment and parts
Regularly inspect equipment for signs of wear and tear
Address any issues promptly to prevent further damage
Keep a record of maintenance and repairs for future reference
TAT and GIGO can be reduced by improving processes and data quality.
Identify bottlenecks in the process and streamline them
Train employees to improve efficiency and accuracy
Implement quality control measures to ensure data accuracy
Use technology to automate processes and reduce manual errors
Regularly review and analyze data to identify areas for improvement
Improving safety requires a comprehensive approach that includes training, communication, and continuous evaluation.
Develop and implement safety protocols and procedures
Provide regular safety training to employees
Encourage open communication about safety concerns
Regularly evaluate and update safety measures
Invest in safety equipment and technology
Establish a safety committee to oversee safety initiatives
I appeared for an interview in Feb 2025.
I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.
Raw material is the basic material used in the production of goods.
Raw material is the primary substance or component used to manufacture products.
It can be natural resources like wood, metal, or minerals.
It can also be processed materials like chemicals or plastics.
Raw materials are transformed into finished products through manufacturing processes.
Clinker is a nodular material produced during the cement manufacturing process.
Clinker is a key ingredient in the production of cement.
It is formed by heating limestone, clay, and other materials in a kiln.
The cooled clinker is then ground into a fine powder to produce cement.
The quality of clinker greatly affects the quality of the final cement product.
Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.
Packing plant capacity is usually measured in units per hour or units per day.
It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.
Factors that can affect packing plant capacity include equipment efficiency, productio
Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.
Coal mill capacity is typically measured in tons per hour or tons per day.
It is important for production engineers to optimize coal mill capacity to meet production demands.
Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.
Increasing coal mill capacity can invol...
A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.
Consists of a hollow cylindrical shell rotating about its axis
The axis of the shell may be horizontal or at a small angle to the horizontal
The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber
The inner surface o...
Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.
Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.
The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.
Common types of raw mills include ball mills, ro...
Dalmia Bharat Cement interview questions for popular designations
I appeared for an interview in Jan 2025.
Get interview-ready with Top Dalmia Bharat Cement Interview Questions
I applied via Approached by Company and was interviewed in Oct 2024. There were 3 interview rounds.
The details aptitude test is, in the company all the workers
and Engineering staff ,office staff to do hard & faithful
work for the company leads to top position in the society. It is one type of aptitude test.
The details of coding test is, in the security Dept the gaurds in night shift the vigels are.
produced genraly. But dangeres is occured then they produce coding 3 vigels.In the circumustances remaing gaurds observe danger imiedatly go there.It is one type of coding test.
The details of the G.D. is, in sugar industry increasing of T.C.D. (tones capacity for day ) then the management conducted a. meeting with Enginering staff workers for increasing of T.C.D. It is one type of Group Discussion .
I appeared for an interview in Aug 2024.
Land acquisition process involves acquiring land for development projects while adhering to government regulations and norms.
Land acquisition involves identifying suitable land for development projects.
Negotiating with landowners for purchase or lease of the land.
Obtaining necessary approvals and permits from government authorities.
Ensuring compliance with environmental regulations and land use laws.
Compensating landow...
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
To hide lying maintenance mechanic jobs, one can falsify records, manipulate data, or cover up mistakes.
Falsify maintenance logs to show completed tasks that were not actually done
Manipulate equipment readings to make it appear that maintenance was performed
Cover up mistakes by quickly fixing issues before they are noticed
Provide false documentation or reports to show compliance with maintenance schedules
Yes, I have practically handled major overhauling work on rotary pumps.
Performed disassembly and reassembly of rotary pumps for maintenance and repair
Replaced worn out parts such as seals, bearings, and impellers
Inspected and tested pump components to ensure proper functioning
Adjusted pump settings and alignments for optimal performance
Trained junior technicians on rotary pump overhauling procedures
I appeared for an interview in Aug 2024.
I am currently responsible for overseeing financial operations, budgeting, forecasting, and financial reporting.
Overseeing financial operations
Budgeting and forecasting
Financial reporting
Profit margins or contributions can be improved by increasing revenue, reducing costs, optimizing pricing strategies, and improving operational efficiency.
Increase revenue through sales growth, expanding into new markets, or introducing new products/services.
Reduce costs by streamlining operations, negotiating better deals with suppliers, or implementing cost-saving measures.
Optimize pricing strategies by conducting ma...
I appeared for an interview in Jan 2025.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Top trending discussions
Some of the top questions asked at the Dalmia Bharat Cement interview -
The duration of Dalmia Bharat Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 207 interviews
Interview experience
based on 2.2k reviews
Rating in categories
20-25 Yrs
Not Disclosed
Assistant Manager
462
salaries
| ₹5.3 L/yr - ₹15 L/yr |
Deputy Manager
296
salaries
| ₹7.1 L/yr - ₹23.5 L/yr |
Senior Executive
291
salaries
| ₹4.8 L/yr - ₹11 L/yr |
Sales Officer
243
salaries
| ₹2.5 L/yr - ₹8.5 L/yr |
Technical Service Engineer
192
salaries
| ₹2.5 L/yr - ₹7.3 L/yr |
UltraTech Cement
JK Cement
Grasim Industries
ACC