I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
MEP services refer to mechanical, electrical, and plumbing services provided in a construction project.
MEP services include design, installation, and maintenance of mechanical systems like HVAC, electrical systems, and plumbing systems.
Mechanical systems cover heating, ventilation, and air conditioning (HVAC) systems.
Electrical systems include power distribution, lighting, and fire alarm systems.
Plumbing systems involv...
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
I applied via Company Website and was interviewed before Feb 2019. There was 1 interview round.
Concerning previous work experience.
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
CQRA interview questions for popular designations
I applied via Company Website and was interviewed in Jun 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Apr 2019. There was 1 interview round.
I was interviewed in Nov 2020.
The code for different building materials varies based on their properties and intended use.
Different building materials require different codes to ensure safety and compliance.
For example, the International Building Code (IBC) is used for structural materials like concrete and steel.
Electrical codes, such as the National Electrical Code (NEC), govern the use of electrical materials.
Plumbing codes, like the Internation...
I applied via Referral and was interviewed before Aug 2021. There were 3 interview rounds.
Top trending discussions
The duration of CQRA interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 24 interviews
Interview experience
Senior Engineer
73
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Quality Engineer
52
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
QA QC Engineer
41
salaries
| ₹4.1 L/yr - ₹7.3 L/yr |
Engineer
32
salaries
| ₹4 L/yr - ₹6.6 L/yr |
Senior Quality Engineer
31
salaries
| ₹4.5 L/yr - ₹9 L/yr |
TCS
Infosys
Wipro
HCLTech