I applied via Campus Placement and was interviewed before Nov 2017. There were 5 interview rounds.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
A truss member is a structural component of a truss, which is a framework of beams used to support a roof or bridge.
Truss members are typically straight and connected at joints.
They can be made of various materials such as wood, steel, or aluminum.
Common types of truss members include chords, webs, and diagonals.
Truss members are designed to carry tension or compression forces efficiently.
Examples of truss members incl
Tower load validation can be checked through structural analysis software and manual calculations.
Use structural analysis software to simulate different load conditions on the tower.
Calculate the expected load on the tower based on the design specifications and environmental factors.
Compare the simulated and calculated loads to ensure they are within the safe limits.
Perform on-site inspections and measurements to verif...
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Patch load on towers refers to the additional weight or load that is applied to a tower structure to strengthen or modify its capacity.
Patch load can be applied to towers to increase their capacity to withstand wind, seismic, or other loads.
Patch load can also be used to redistribute loads on a tower to prevent structural failures.
Examples of patch loads include adding steel plates or braces to a tower structure to inc...
Codes on towers refer to the specific design and construction standards that must be followed for safety and structural integrity.
Codes on towers are regulations set by organizations like ANSI/TIA and ASCE that dictate the design, construction, and maintenance of towers.
These codes cover aspects such as materials used, structural design, wind loading, and safety factors.
For example, ANSI/TIA-222-G specifies the require...
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
Design of pier involves considering various factors such as load capacity, soil conditions, water level, and environmental impact.
Determine the load capacity and type of pier required
Analyze soil conditions and water level to determine foundation type
Consider environmental impact and regulations
Design for durability and maintenance
Ensure safety measures are in place
Rigid pile caps are designed to transfer the load from the superstructure to the piles. The design should consider the pile arrangement, load distribution, and soil properties.
The pile cap should be designed to distribute the load evenly to the piles.
The pile arrangement should be considered to ensure that the pile cap is not overloaded.
The soil properties should be analyzed to determine the bearing capacity of the pil...
Prestressing losses occur during the transfer of prestress from the jacks to the concrete. These losses can be divided into two stages.
The first stage is immediate losses, which occur due to friction between the strands and the ducts, anchorage slip, and elastic shortening of the concrete.
The second stage is time-dependent losses, which occur due to creep and shrinkage of the concrete, relaxation of the steel, and temp...
Design of steel members and connections involves determining the appropriate size and shape of steel components and how they are connected.
Consider the loads and stresses that the steel members will be subjected to
Select appropriate steel sections based on their strength and stiffness
Design connections that can transfer loads between members without failure
Ensure that the design complies with relevant codes and standar...
Pre-tension is applied before concrete is poured, while post-tension is applied after concrete has hardened.
Pre-tension involves stretching steel cables or bars before pouring concrete to create tension in the concrete as it sets.
Post-tension involves inserting steel cables or bars into hardened concrete and then tensioning them to create compression in the concrete.
Pre-tension is typically used in precast concrete ele...
Analysis and design of piles involves determining the load capacity and selecting the appropriate type of pile for a given soil condition.
Pile load capacity is determined through various methods such as static load tests, dynamic load tests, and pile integrity tests.
Factors such as soil type, groundwater level, and seismic activity must be considered when selecting the type of pile.
Common types of piles include driven ...
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Developed a unique algorithm to optimize data processing in a large-scale distributed system.
Identified a bottleneck in the system's data processing pipeline
Implemented a parallel processing approach to distribute the workload across multiple nodes
Utilized a combination of caching and pre-processing techniques to reduce computational overhead
Achieved a significant improvement in overall system performance and reduced p
Yes
Yes, I have received constructive criticism on my work assignments.
I always view constructive criticism as an opportunity for growth and improvement.
I actively listen to the feedback provided and take notes to ensure I understand the areas that need improvement.
I analyze the criticism objectively and identify areas where I can make adjustments or implement changes.
I seek clarification if needed and ask for specific ...
I have extensive experience interfacing with clients both directly and indirectly.
I have worked as a Senior Engineer for the past five years, where I have regularly interacted with clients.
I have directly communicated with clients to gather requirements, provide updates, and address any concerns or issues.
I have also indirectly interfaced with clients through project managers and business analysts, ensuring their needs...
Yes, I have experience dealing with treatment plant equipment such as screens, grit, macerator, and sludge handling equipment.
I have worked on various projects involving the installation and maintenance of treatment plant equipment.
I am familiar with the operation and troubleshooting of screens used for removing large debris from wastewater.
I have experience with grit removal systems that separate sand, gravel, and oth...
Yes
Implemented a new Agile methodology to improve team productivity
Introduced a knowledge sharing platform to encourage continuous learning
Implemented a mentorship program to foster professional growth
Introduced automated testing tools to improve software quality
Orifice std refers to standard orifice sizes used in engineering. Types of taps include flange taps, corner taps, and D and D/2 taps.
Orifice std refers to standard sizes of orifices used in flow measurement
Types of taps include flange taps, corner taps, and D and D/2 taps
Flange taps are used for large pipes, corner taps for small pipes, and D and D/2 taps for general applications
Pressure gauge operating range refers to the minimum and maximum pressure values that the gauge can accurately measure.
Pressure gauge operating range is typically specified by the manufacturer.
It is important to ensure that the pressure being measured falls within the gauge's operating range to ensure accurate readings.
For example, a pressure gauge with an operating range of 0-100 psi should not be used to measure pres
Straight length requirements for orifice flow element ensure accurate measurement by allowing flow to stabilize before reaching the element.
Straight length requirements typically range from 10 to 44 pipe diameters upstream and 5 to 22 pipe diameters downstream of the orifice.
These requirements help prevent flow disturbances and ensure accurate measurement of flow rate.
For example, if the pipe diameter is 4 inches, the ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
BIM Modeller
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
BIM Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
BIM Coordinator
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Ramboll
AECOM
Jacobs Engineering Group
WSP