CPM & Critical Path Method (CPM) is a project management technique used to determine the longest sequence of dependent tasks and the shortest time to complete a project.
CPM is used to identify the critical path in a project, which is the sequence of tasks that determines the total duration of the project.
It helps in scheduling, resource allocation, and monitoring the progress of a project.
By focusing on the critica...
PERT is a project management tool used to estimate time for completing a project. It involves various time estimates and differs from CPM.
PERT stands for Program Evaluation and Review Technique
Various time estimates in PERT include optimistic time, pessimistic time, and most likely time for completing a task
Difference between PERT and CPM is that PERT is used when time estimates are uncertain and CPM is used when time ...
Slump for pump able concrete refers to the consistency of the concrete mix that allows it to be easily pumped through a hose.
Slump is a measure of the consistency of concrete, with pumpable concrete typically having a higher slump value for easier pumping.
Factors affecting slump for pumpable concrete include water content, aggregate size, and admixtures.
Examples of pumpable concrete include self-leveling concrete and h
Some of the top questions asked at the Consolidated Construction Consortium interview -
based on 4 interviews
Interview experience
based on 280 reviews
Rating in categories
Civil Site Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company