CBRE
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
The market rate of steel fluctuates based on supply and demand, global economic conditions, and trade policies.
Market rate of steel is influenced by factors such as supply and demand dynamics.
Global economic conditions, such as GDP growth and industrial output, impact steel prices.
Trade policies and tariffs can also affect the market rate of steel.
Steel prices can vary based on the type of steel (e.g. carbon steel, sta...
Yes, there are codes that need to be followed for BBS (Bar Bending Schedule) and steel cut lengths.
Codes such as IS 2502:1963 and IS 1786:2008 provide guidelines for BBS and steel cut lengths.
BBS includes details like bar mark, diameter, length, shape, and bending dimensions.
Steel cut lengths should be as per the required dimensions specified in the design drawings.
Following the codes ensures structural integrity and c
Rate for brickwork, formwork, and wardrobe dates are commonly used in construction projects to estimate costs.
Rate for brickwork is typically calculated per cubic meter (1cum)
Formwork is measured in square meters (sqm)
Wardrobe dates are measured in square feet (sft)
Rate analysis of Kota stone involves calculating the cost of materials, labor, and other expenses for a specific quantity of Kota stone work.
Calculate the cost of Kota stone per square foot or square meter.
Include the cost of transportation, labor, and other miscellaneous expenses.
Consider the wastage factor while calculating the total cost.
Compare the rates of different suppliers to get the best deal.
Use software or o
Rate analysis of granite involves calculating the cost of materials, labor, and equipment needed for a specific project.
Determine the quantity of granite required for the project
Calculate the cost of granite per unit
Estimate the cost of transportation, labor, and equipment
Factor in any additional costs such as taxes or overhead expenses
Compare quotes from different suppliers to get the best rate
To prepare the bbs, you need to marinate the meat, skewer it, and grill it to perfection.
Marinate the meat in a mixture of spices, yogurt, and lemon juice for at least 2 hours.
Skewer the marinated meat along with vegetables like bell peppers and onions.
Grill the skewers on a hot grill until the meat is cooked through and has a nice charred exterior.
Yes, I have knowledge of LISP commands in AutoCAD for QS works.
I have experience using LISP commands in AutoCAD for quantity surveying tasks.
I can create custom commands and automate repetitive tasks using LISP in AutoCAD.
For example, I have used LISP to generate reports, extract data, and streamline workflows in AutoCAD for QS projects.
I applied via Referral
Experienced transportation specialist with a background in logistics and supply chain management.
Over 5 years of experience in coordinating transportation operations
Skilled in optimizing routes and reducing costs
Proficient in using transportation management systems
Strong communication and problem-solving skills
Managed a team of drivers and ensured timely deliveries
I demonstrate my qualifications and capabilities through my experience, skills, certifications, and successful projects.
Providing examples of past projects where I successfully managed transportation logistics
Highlighting relevant certifications such as CDL or PMP
Showcasing my problem-solving skills through real-life scenarios
Demonstrating my knowledge of transportation regulations and best practices
Transport services efficiency is crucial for timely and cost-effective movement of goods and people.
Efficiency of transport services can be measured by factors such as on-time delivery, fuel consumption, and vehicle utilization.
Utilizing technology like GPS tracking and route optimization software can improve efficiency.
Examples of efficient transport services include companies like UPS and FedEx, known for their relia...
As a Transportation Specialist, my role would involve coordinating and optimizing transportation operations to ensure efficient and timely delivery of goods.
Coordinating transportation schedules and routes
Optimizing transportation operations to reduce costs and improve efficiency
Ensuring timely delivery of goods to customers
Monitoring and tracking transportation vehicles and shipments
Collaborating with drivers, supplie
I enjoy working with a team and believe collaboration leads to better results.
I believe teamwork allows for different perspectives and ideas to be shared
I am comfortable communicating and collaborating with team members
I have experience working in team-oriented environments, such as group projects or team sports
Lack of promotions may be due to focusing on gaining experience and expertise in current role rather than seeking promotions.
I have chosen to focus on gaining valuable experience and expertise in my current role rather than actively seeking promotions.
I have taken on additional responsibilities and projects to enhance my skills and knowledge in my field.
I have consistently received positive feedback on my performance a...
I would represent your company with professionalism, dedication, and a commitment to excellence.
I would always prioritize safety and efficiency in all transportation operations.
I would communicate effectively with clients, colleagues, and stakeholders to ensure smooth operations.
I would uphold the company's values and reputation in all interactions and transactions.
I would continuously seek opportunities for improvemen...
Yes, I believe that my team and I can represent the company and department well.
We have a strong track record of professionalism and dedication to our work.
Our team has excellent communication skills and a strong work ethic.
We are committed to upholding the values and reputation of the company.
We have successfully represented the company at various events and meetings in the past.
I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.
Achieving net zero requires a combination of reducing emissions, increasing renewable energy usage, and implementing carbon offsetting strategies.
Reduce carbon emissions through energy efficiency improvements and transitioning to renewable energy sources
Increase renewable energy usage by investing in solar, wind, and hydro power
Implement carbon offsetting strategies such as reforestation projects or carbon capture tech...
I expect to contribute to the development and implementation of sustainable energy solutions.
Contribute to the development of renewable energy projects
Implement energy efficiency initiatives
Collaborate with stakeholders to promote sustainability
Stay updated on industry trends and technologies
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
CBRE interview questions for popular designations
I appeared for an interview in Feb 2025, where I was asked the following questions.
In my previous role, I managed facility operations, ensuring efficiency and compliance with safety standards.
Oversaw daily operations of the facility, including maintenance and security.
Implemented energy-saving initiatives that reduced costs by 15%.
Coordinated with vendors for timely repairs and service contracts.
Led a team of 10 staff members, providing training and performance evaluations.
Developed and maintained em
I possess a diverse range of technical skills in facility management, including HVAC systems, electrical systems, and safety protocols.
Proficient in HVAC system maintenance and troubleshooting, ensuring optimal performance and energy efficiency.
Experienced in managing electrical systems, including wiring, circuit breakers, and lighting installations.
Skilled in implementing safety protocols and compliance measures, redu...
Get interview-ready with Top CBRE Interview Questions
Shear force and bending moment are key concepts in structural engineering, representing internal forces in a beam.
Shear force is the force perpendicular to the beam's longitudinal axis, causing it to shear or slide.
Bending moment is the internal moment that causes a beam to bend or flex.
Shear force and bending moment diagrams are used to visualize the distribution of these forces along the length of a beam.
Calculating ...
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
I appeared for an interview in Oct 2024.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
HVAC stands for Heating, Ventilation, and Air Conditioning. It refers to the system used to control the temperature, humidity, and air quality in a building.
HVAC systems are responsible for heating and cooling buildings to maintain a comfortable environment for occupants.
Ventilation systems help circulate and filter air to improve indoor air quality.
Air conditioning systems control the temperature and humidity levels w...
STP stands for Sewage Treatment Plant, which is a facility used to treat wastewater from residential, commercial, and industrial sources.
STP receives wastewater from various sources
Primary treatment involves physical processes to remove solids
Secondary treatment uses biological processes to further treat the wastewater
Tertiary treatment may be used to remove remaining contaminants
Treated water is discharged or reused
Ex...
To work a DG Set, ensure proper maintenance, fuel supply, and monitoring of performance.
Ensure regular maintenance checks to keep the DG Set in good working condition
Monitor fuel supply to ensure uninterrupted power generation
Keep track of performance indicators like load capacity and efficiency
Train staff on operating procedures and emergency protocols
Have a backup plan in case of power failure
The safety of a transformer is crucial for preventing accidents and ensuring reliable power distribution.
Regular maintenance and inspections are essential to ensure the safe operation of transformers.
Proper grounding and insulation are key factors in maintaining the safety of transformers.
Implementing safety protocols and training for personnel working with transformers is important to prevent accidents.
Using protectiv...
MPU stands for Main Power Unit. It is responsible for providing power to critical systems in a facility.
MPU is a key component in ensuring uninterrupted power supply to critical systems such as data centers, hospitals, and emergency response centers.
It often includes backup power sources such as generators or battery systems to ensure continuous operation in case of power outages.
Regular maintenance and testing of MPU ...
The duration of CBRE interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 289 interviews
Interview experience
Assistant Manager
1.6k
salaries
| ₹3.5 L/yr - ₹13 L/yr |
Facility Executive
649
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Assistant Facility Manager
518
salaries
| ₹3.5 L/yr - ₹10.2 L/yr |
Facility Manager
503
salaries
| ₹3.8 L/yr - ₹14.3 L/yr |
Deputy Manager
483
salaries
| ₹4 L/yr - ₹13.5 L/yr |
JLL
NoBroker
Cushman & Wakefield
Colliers India