Upload Button Icon Add office photos

CBRE

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

CBRE Facility Executive - Technical Interview Questions, Process, and Tips

Updated 15 Mar 2025

Top CBRE Facility Executive - Technical Interview Questions and Answers

View all 10 questions

CBRE Facility Executive - Technical Interview Experiences

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. What is your Role in previous Company?
  • Ans. 

    In my previous role, I managed facility operations, ensuring efficiency and compliance with safety standards.

    • Oversaw daily operations of the facility, including maintenance and security.

    • Implemented energy-saving initiatives that reduced costs by 15%.

    • Coordinated with vendors for timely repairs and service contracts.

    • Led a team of 10 staff members, providing training and performance evaluations.

    • Developed and maintained em

  • Answered by AI
  • Q2. Tell me about your technical skills?
  • Ans. 

    I possess a diverse range of technical skills in facility management, including HVAC systems, electrical systems, and safety protocols.

    • Proficient in HVAC system maintenance and troubleshooting, ensuring optimal performance and energy efficiency.

    • Experienced in managing electrical systems, including wiring, circuit breakers, and lighting installations.

    • Skilled in implementing safety protocols and compliance measures, redu...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Electrical and maintanance

Round 2 - Technical 

(12 Questions)

  • Q1. Types of chiller
  • Ans. 

    There are several types of chillers used in facilities, including air-cooled, water-cooled, absorption, and centrifugal chillers.

    • Air-cooled chillers use air to remove heat from the refrigerant.

    • Water-cooled chillers use water to remove heat from the refrigerant.

    • Absorption chillers use a heat source, such as natural gas or steam, to drive the refrigeration cycle.

    • Centrifugal chillers use centrifugal force to compress the

  • Answered by AI
  • Q2. DG, HVAC, UPS, PAC, BMS Documents Reports etc
  • Q3. What are the checks and frequency of DG
  • Ans. 

    Regular checks and maintenance are essential for ensuring the proper functioning of DG (Diesel Generator) systems.

    • Daily visual inspections for leaks, damages, and loose connections.

    • Weekly checks for fuel levels, coolant levels, and battery condition.

    • Monthly load testing to ensure the generator can handle the required load.

    • Annual maintenance including oil and filter changes, spark plug replacement, and thorough cleaning...

  • Answered by AI
  • Q4. What is the UPS and Types of UPS
  • Ans. 

    UPS stands for Uninterruptible Power Supply. There are three types of UPS: standby, line-interactive, and online.

    • UPS stands for Uninterruptible Power Supply.

    • UPS provides backup power to critical equipment during power outages or fluctuations.

    • The three types of UPS are standby, line-interactive, and online.

    • Standby UPS switches to battery power when the main power source fails.

    • Line-interactive UPS regulates voltage fluct...

  • Answered by AI
  • Q5. What is the safety prications of before working working
  • Ans. 

    Safety precautions before working

    • Conduct a thorough risk assessment of the work area

    • Ensure all necessary personal protective equipment (PPE) is available and worn

    • Implement proper training and education on safety procedures

    • Inspect and maintain tools and equipment regularly

    • Establish emergency response plans and procedures

    • Promote a culture of safety and encourage reporting of hazards or incidents

  • Answered by AI
  • Q6. What are the safety measurements of UPS
  • Ans. 

    UPS (Uninterruptible Power Supply) safety measures include surge protection, battery backup, and automatic voltage regulation.

    • Surge protection safeguards electronic devices from power surges or spikes.

    • Battery backup provides temporary power during outages, preventing data loss or equipment damage.

    • Automatic voltage regulation stabilizes voltage levels, protecting equipment from fluctuations.

    • UPS systems may have audible ...

  • Answered by AI
  • Q7. How to maintan the Trasformer
  • Ans. 

    To maintain a transformer, regular inspections, cleaning, and testing are necessary.

    • Perform regular visual inspections to check for any signs of damage or leaks.

    • Clean the transformer regularly to remove dust, dirt, and debris.

    • Test the transformer's insulation resistance to ensure it is within acceptable limits.

    • Monitor the transformer's temperature and oil levels regularly.

    • Perform oil analysis to detect any potential is...

  • Answered by AI
  • Q8. What types of work permets is there
  • Q9. What is 52 week shadule
  • Ans. 

    A 52-week schedule is a plan that outlines tasks, events, or milestones for each week of a year.

    • A 52-week schedule helps in organizing and managing tasks throughout the year.

    • It can be used in various industries such as project management, event planning, and manufacturing.

    • Each week of the schedule may include specific goals, deadlines, or activities.

    • Examples of 52-week schedules include construction project timelines, ...

  • Answered by AI
  • Q10. What is difference between chiller and PAC
  • Ans. 

    A chiller is a refrigeration system used to cool large spaces, while a PAC (Portable Air Conditioner) is a compact unit used for localized cooling.

    • Chillers are typically used in commercial or industrial settings to cool large areas such as office buildings or factories.

    • PACs are smaller and more portable, designed to cool specific areas or rooms.

    • Chillers use a refrigeration cycle to remove heat from the air or water, wh...

  • Answered by AI
  • Q11. Which type of fire Extingusher used in server room
  • Ans. 

    A clean agent fire extinguisher is typically used in server rooms.

    • Clean agent fire extinguishers are designed to suppress fires without leaving residue or damaging sensitive equipment.

    • They use chemicals like halon, carbon dioxide, or clean agents like FM-200 or Novec 1230.

    • These extinguishers are effective in suppressing fires involving electrical equipment and are safe for use in server rooms.

    • It is important to consult...

  • Answered by AI
  • Q12. What is the 6S
  • Ans. 

    6S is a workplace organization methodology that focuses on creating a clean, efficient, and safe environment.

    • 6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.

    • It is derived from the 5S methodology and adds an additional focus on safety.

    • Sort involves removing unnecessary items from the workplace.

    • Set in Order involves organizing and arranging necessary items in a logical manner.

    • Shine refers to cle...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for CBRE Facility Executive - Technical interview:
  • HVAC, DG, Transformer, PAC,
Interview preparation tips for other job seekers - Confidently Answer in interview all these questions

Skills evaluated in this interview

Facility Executive - Technical Interview Questions Asked at Other Companies

asked in CBRE
Q1. What is the safety prications of before working working
asked in CBRE
Q2. Which type of fire Extingusher used in server room
asked in CBRE
Q3. What is difference between chiller and PAC
asked in JLL
Q4. What do you understand with the fire alarm system.
asked in JLL
Q5. What are the benefits VESDA used in Server room?

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Where do you work and what are your responsibilities
  • Ans. I told about my job profile and responsibilities
  • Answered Anonymously
  • Q2. Asked technical questions on electrical engineering regarding DG UPS maintenance
  • Q3. Are you ready to relocate

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be yourself and honest. Don't just speak bla bla. If u know the answer then answer it properly and u don't know than take time if u can recall or else say clearly that u don't remember.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Till as about your self
  • Q2. Why you are leaving your current employer
  • Q3. Related to my education background

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidential

CBRE interview questions for designations

 Facility Engineer

 (1)

 Facility Executive

 (13)

 Senior Facility Engineer

 (1)

 Assistant Technical Facility Manager

 (2)

 Senior Facility Executive

 (2)

 Facility Manager

 (5)

 Facility Coordinator

 (1)

 Technical Executive

 (1)

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. DG, Chiller, HVAC, Fire & Safety, EHS, Soft Services
  • Q2. Building Compliance, PPM, Energy Savings.
  • Q3. Overall Building operations & client dealing. Management of Ground Team
Round 2 - HR 

(2 Questions)

  • Q1. Ground Team Management
  • Q2. Dealing with odd situations

Interview Preparation Tips

Interview preparation tips for other job seekers - For Technicals
You Must have knowledge of E&M equipments. Its operation and PPM,

I applied via Walk-in and was interviewed before Sep 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Topic for group discussion was GST. I spoke in favour of GST.

Round 3 - Technical 

(1 Question)

  • Q1. I was asked questions related to HVAC system, Data center management in terms of fire fighting, power supplies, temperature control, load etc.
Round 4 - HR 

(1 Question)

  • Q1. I was asked question related to my family members, last job salaries, etc.
Round 5 - One-on-one 

(1 Question)

  • Q1. I was asked to visit the site and meet with client for final outcomes.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and prepare for your interview. Be focus on communications parts as well.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical related Questions aks
  • Q2. Document in Facility

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for this position interview technical and facilities documents
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about the the current job profile
  • Q2. How much experience do you have in this filed
  • Q3. How much hike would do you expect from our side
Round 3 - Technical 

(7 Questions)

  • Q1. Tell me about the your self
  • Q2. Do you have know about job profile , can you explan it ?
  • Q3. What do you understand with the fire alarm system.
  • Ans. 

    A fire alarm system is a network of devices designed to detect and alert people to the presence of a fire in a building.

    • Fire alarm systems typically consist of smoke detectors, heat detectors, alarms, and control panels.

    • When a fire is detected, the system activates alarms to alert occupants and authorities.

    • Modern fire alarm systems may also include features such as remote monitoring and automatic notification of emerge...

  • Answered by AI
  • Q4. What is your current role in your current company
  • Q5. Why would you want change your job
  • Q6. What do understand with energy saving
  • Ans. 

    Energy saving refers to the practice of reducing energy consumption in order to decrease energy costs and minimize environmental impact.

    • Implementing energy-efficient lighting systems

    • Upgrading to energy-efficient appliances

    • Using programmable thermostats to regulate heating and cooling

    • Sealing air leaks in buildings to prevent energy loss

    • Utilizing renewable energy sources like solar panels

  • Answered by AI
  • Q7. What is diffrence between AMC & CAMC
  • Ans. 

    AMC stands for Annual Maintenance Contract, while CAMC stands for Comprehensive Annual Maintenance Contract.

    • AMC typically covers regular maintenance services for equipment or systems, while CAMC includes both preventive maintenance and repair services.

    • CAMC is more comprehensive and usually covers a wider range of services compared to AMC.

    • AMC may have limitations on the scope of services provided, while CAMC offers a mo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep strong your technical and they put out the questions from your resume so that you have wise knowledge about your resume topic.

I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Like a dg set, Transformer, Ups and HVAC system
Round 3 - Group Discussion 

How to manage floor, role and responsibility of executive, team handling

Round 4 - HR 

(1 Question)

  • Q1. Why you want to join this organisation
  • Ans. 

    I want to join this organization because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • The organization has a strong reputation in the industry, which would enhance my professional profile.

    • There are ample opportunities for growth and advancement within the organization.

    • The organization's values and mission align with my own career goals and aspirations.

    • I am impressed by the orga...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be prepare what ever you applied for a post it should be deeply study related to applied post
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Round 1 - Technical 

(1 Question)

  • Q1. HVAC Working Principles

CBRE Interview FAQs

How many rounds are there in CBRE Facility Executive - Technical interview?
CBRE interview process usually has 2 rounds. The most common rounds in the CBRE interview process are Resume Shortlist, Aptitude Test and Technical.
How to prepare for CBRE Facility Executive - Technical interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at CBRE. The most common topics and skills that interviewers at CBRE expect are HVAC, Facility Management, MEP, Building Maintenance and DG Sets.
What are the top questions asked in CBRE Facility Executive - Technical interview?

Some of the top questions asked at the CBRE Facility Executive - Technical interview -

  1. What is the safety prications of before working work...read more
  2. Which type of fire Extingusher used in server r...read more
  3. What is difference between chiller and ...read more

Tell us how to improve this page.

CBRE Facility Executive - Technical Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 359 Interviews
NoBroker Interview Questions
3.2
 • 235 Interviews
Colliers India Interview Questions
3.9
 • 66 Interviews
K Raheja Corp Interview Questions
4.3
 • 46 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
SMEC Interview Questions
3.8
 • 26 Interviews
ASSA ABLOY Interview Questions
3.5
 • 17 Interviews
View all
CBRE Facility Executive - Technical Salary
based on 161 salaries
₹2.5 L/yr - ₹6.6 L/yr
9% more than the average Facility Executive - Technical Salary in India
View more details

CBRE Facility Executive - Technical Reviews and Ratings

based on 65 reviews

4.6/5

Rating in categories

4.6

Skill development

4.5

Work-life balance

4.4

Salary

4.7

Job security

4.6

Company culture

4.2

Promotions

4.5

Work satisfaction

Explore 65 Reviews and Ratings
Assistant Manager
1.6k salaries
unlock blur

₹3.5 L/yr - ₹10.8 L/yr

Facility Executive
644 salaries
unlock blur

₹2.2 L/yr - ₹6.3 L/yr

Assistant Facility Manager
517 salaries
unlock blur

₹3.5 L/yr - ₹10.2 L/yr

Facility Manager
503 salaries
unlock blur

₹3.8 L/yr - ₹14.3 L/yr

Deputy Manager
486 salaries
unlock blur

₹4 L/yr - ₹13.5 L/yr

Explore more salaries
Compare CBRE with

JLL

4.1
Compare

NoBroker

3.2
Compare

Cushman & Wakefield

4.1
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview