Add office photos
Employer?
Claim Account for FREE

CBRE

4.2
based on 3.8k Reviews
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by

10+ Shiash Info Solutions Interview Questions and Answers

Updated 5 Feb 2024
Popular Designations

Q1. What is the safety prications of before working working

Ans.

Safety precautions before working

  • Conduct a thorough risk assessment of the work area

  • Ensure all necessary personal protective equipment (PPE) is available and worn

  • Implement proper training and education on safety procedures

  • Inspect and maintain tools and equipment regularly

  • Establish emergency response plans and procedures

  • Promote a culture of safety and encourage reporting of hazards or incidents

Add your answer

Q2. Which type of fire Extingusher used in server room

Ans.

A clean agent fire extinguisher is typically used in server rooms.

  • Clean agent fire extinguishers are designed to suppress fires without leaving residue or damaging sensitive equipment.

  • They use chemicals like halon, carbon dioxide, or clean agents like FM-200 or Novec 1230.

  • These extinguishers are effective in suppressing fires involving electrical equipment and are safe for use in server rooms.

  • It is important to consult local fire codes and regulations to determine the specifi...read more

View 2 more answers

Q3. What is difference between chiller and PAC

Ans.

A chiller is a refrigeration system used to cool large spaces, while a PAC (Portable Air Conditioner) is a compact unit used for localized cooling.

  • Chillers are typically used in commercial or industrial settings to cool large areas such as office buildings or factories.

  • PACs are smaller and more portable, designed to cool specific areas or rooms.

  • Chillers use a refrigeration cycle to remove heat from the air or water, while PACs use a compressor and refrigerant to cool the air....read more

Add your answer

Q4. What are the checks and frequency of DG

Ans.

Regular checks and maintenance are essential for ensuring the proper functioning of DG (Diesel Generator) systems.

  • Daily visual inspections for leaks, damages, and loose connections.

  • Weekly checks for fuel levels, coolant levels, and battery condition.

  • Monthly load testing to ensure the generator can handle the required load.

  • Annual maintenance including oil and filter changes, spark plug replacement, and thorough cleaning.

  • Regular checks of safety features like emergency stop but...read more

Add your answer
Discover Shiash Info Solutions interview dos and don'ts from real experiences

Q5. What is the UPS and Types of UPS

Ans.

UPS stands for Uninterruptible Power Supply. There are three types of UPS: standby, line-interactive, and online.

  • UPS stands for Uninterruptible Power Supply.

  • UPS provides backup power to critical equipment during power outages or fluctuations.

  • The three types of UPS are standby, line-interactive, and online.

  • Standby UPS switches to battery power when the main power source fails.

  • Line-interactive UPS regulates voltage fluctuations and switches to battery power when necessary.

  • Onlin...read more

Add your answer

Q6. What are the safety measurements of UPS

Ans.

UPS (Uninterruptible Power Supply) safety measures include surge protection, battery backup, and automatic voltage regulation.

  • Surge protection safeguards electronic devices from power surges or spikes.

  • Battery backup provides temporary power during outages, preventing data loss or equipment damage.

  • Automatic voltage regulation stabilizes voltage levels, protecting equipment from fluctuations.

  • UPS systems may have audible alarms, visual indicators, and remote monitoring for safet...read more

Add your answer

Q7. How to maintan the Trasformer

Ans.

To maintain a transformer, regular inspections, cleaning, and testing are necessary.

  • Perform regular visual inspections to check for any signs of damage or leaks.

  • Clean the transformer regularly to remove dust, dirt, and debris.

  • Test the transformer's insulation resistance to ensure it is within acceptable limits.

  • Monitor the transformer's temperature and oil levels regularly.

  • Perform oil analysis to detect any potential issues or contaminants.

  • Ensure proper ventilation and cooling...read more

Add your answer

Q8. What is 52 week shadule

Ans.

A 52-week schedule is a plan that outlines tasks, events, or milestones for each week of a year.

  • A 52-week schedule helps in organizing and managing tasks throughout the year.

  • It can be used in various industries such as project management, event planning, and manufacturing.

  • Each week of the schedule may include specific goals, deadlines, or activities.

  • Examples of 52-week schedules include construction project timelines, marketing campaign calendars, and maintenance plans.

Add your answer

Q9. What is the 6S

Ans.

6S is a workplace organization methodology that focuses on creating a clean, efficient, and safe environment.

  • 6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.

  • It is derived from the 5S methodology and adds an additional focus on safety.

  • Sort involves removing unnecessary items from the workplace.

  • Set in Order involves organizing and arranging necessary items in a logical manner.

  • Shine refers to cleaning and maintaining the workplace.

  • Standardize involves c...read more

Add your answer

Q10. Types of chiller

Ans.

There are several types of chillers used in facilities, including air-cooled, water-cooled, absorption, and centrifugal chillers.

  • Air-cooled chillers use air to remove heat from the refrigerant.

  • Water-cooled chillers use water to remove heat from the refrigerant.

  • Absorption chillers use a heat source, such as natural gas or steam, to drive the refrigeration cycle.

  • Centrifugal chillers use centrifugal force to compress the refrigerant and remove heat.

Add your answer

More about working at CBRE

Top Rated Large Company - 2024
Top Rated Construction Company - 2024
HQ - Los Angeles, California, United States (USA)
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Shiash Info Solutions

based on 1 interviews
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter