Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by B.L. Kashyap & Sons Team. If you also belong to the team, you can get access from here

B.L. Kashyap & Sons Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 477 Reviews

Filter interviews by

B.L. Kashyap & Sons Assistant Project Manager Interview Questions and Answers

Updated 2 Jan 2024

B.L. Kashyap & Sons Assistant Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous company name,
  • Ans. Shapoorji pallonji and company private limited
  • Answered by DARSHAN N
Round 3 - Technical 

(10 Questions)

  • Q1. About the previous project
  • Q2. All civil execution questions
  • Q3. About the mivan shuttering
  • Q4. About the rate analysis
  • Q5. About the bar bending
  • Q6. Current market labour rate and material price
  • Ans. 

    The current market labour rate and material price can vary depending on location, demand, and supply.

    • Labour rates can be influenced by factors such as skill level, experience, and union agreements.

    • Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.

    • It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater

  • Answered by AI
  • Q7. Quality assurance and control
  • Q8. Cast controlling and micro schedule
  • Q9. Project men material tools equipments management
  • Q10. Structural and finishing
Round 4 - Salary  

(3 Questions)

  • Q1. What's your current salary
  • Q2. What's your expectations
  • Q3. How soon can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience

Interview questions from similar companies

I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What activities are performed in the testing and commissioning of TVS system ?
  • Ans. 

    Testing and commissioning of TVS system involves various activities to ensure its proper functioning.

    • Verification of wiring and connections

    • Functional testing of individual components

    • Integration testing of the entire system

    • Performance testing under different load conditions

    • Verification of safety features

    • Documentation of test results and commissioning procedures

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Never lie in your CV . Whatever experience you have mentioned in the CV it should be in your mind coz you will be asked the relevant questions and your answer should reflect the same.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Discuss about Work Experience and skill.
  • Q2. Current work detail.
  • Q3. What is the team size under you and what is management ability.
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about Current salary
  • Q2. Discussion about expected salary with negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Must try to get an job opportunity here.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Water supply project
  • Q2. Civil work and di pipe , HDPE pipe lines

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Arvind Kumar my water supply project experience 11
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Details about Bar Bending Shedule(BBS). What is your current company responsibility. Etc
Round 3 - HR 

(7 Questions)

  • Q1. Why should we hire you?
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Share details of your previous job.
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding my past working experience
Round 3 - HR 

(1 Question)

  • Q1. Documentation checking and processing
Round 1 - HR 

(2 Questions)

  • Q1. What is your family background?
  • Q2. As required for Electrical project Engineer
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About concrete design and technical discussions
Round 3 - HR 

(1 Question)

  • Q1. About salary negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Try until you find a good job which suits to your requirements

I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What activities are performed in the testing and commissioning of TVS system ?
  • Ans. 

    Testing and commissioning of TVS system involves various activities to ensure its proper functioning.

    • Verification of wiring and connections

    • Functional testing of individual components

    • Integration testing of the entire system

    • Performance testing under different load conditions

    • Verification of safety features

    • Documentation of test results and commissioning procedures

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Never lie in your CV . Whatever experience you have mentioned in the CV it should be in your mind coz you will be asked the relevant questions and your answer should reflect the same.

I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About BOQ and work order
  • Q2. Tender document for specification

Interview Preparation Tips

Interview preparation tips for other job seekers - Be frank what ever u know

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons Assistant Project Manager interview?
B.L. Kashyap & Sons interview process usually has 4 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Resume Shortlist, HR and Technical.
How to prepare for B.L. Kashyap & Sons Assistant Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B.L. Kashyap & Sons. The most common topics and skills that interviewers at B.L. Kashyap & Sons expect are Construction, Design Engineering, Electricals, Engineering Coordination and Execution.
What are the top questions asked in B.L. Kashyap & Sons Assistant Project Manager interview?

Some of the top questions asked at the B.L. Kashyap & Sons Assistant Project Manager interview -

  1. Current market labour rate and material pr...read more
  2. Project men material tools equipments managem...read more
  3. Cast controlling and micro sched...read more

Tell us how to improve this page.

B.L. Kashyap & Sons Assistant Project Manager Salary
based on 21 salaries
₹6 L/yr - ₹12 L/yr
At par with the average Assistant Project Manager Salary in India
View more details

B.L. Kashyap & Sons Assistant Project Manager Reviews and Ratings

based on 10 reviews

3.4/5

Rating in categories

3.6

Skill development

3.2

Work-Life balance

2.9

Salary & Benefits

3.5

Job Security

3.3

Company culture

2.7

Promotions/Appraisal

3.4

Work Satisfaction

Explore 10 Reviews and Ratings
Site Engineer
106 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Civil Site Engineer
92 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
77 salaries
unlock blur

₹4.1 L/yr - ₹8 L/yr

Junior Engineer
41 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Junior Engineer Civil
36 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview