I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about urself
  • Q2. Technical skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Portal and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

Based on basics in civil engineering

Round 2 - Technical 

(4 Questions)

  • Q1. Asked questions about previous working
  • Q2. Athu yethuku ipo
  • Q3. Basic civil engineering
  • Q4. Unit weight of materials
  • Ans. 

    Unit weight of materials refers to the weight of a material per unit volume.

    • Unit weight is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • It is an important factor in construction and engineering for determining loads and designing structures.

    • For example, the unit weight of concrete is around 150 pounds per cubic foot.

    • Different materials have different unit weights based on their density and c

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Ne brave and attend it honestly

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Please send me a date and time a interview one-on-one round
  • Q2. All questions are site engineer types
  • Q3. Piping and equipment erection and planning

I applied via Newspaper Ad and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What's is unit weight of 25 dia bar
  • Ans. 

    The unit weight of 25 dia bar varies depending on the material used.

    • The unit weight of 25 dia bar made of steel is approximately 3.85 kg/m

    • The unit weight of 25 dia bar made of brass is approximately 8.47 kg/m

    • The unit weight of 25 dia bar made of aluminum is approximately 1.23 kg/m

  • Answered by AI
  • Q2. What is laping length
  • Ans. 

    Lapping length is the length of overlap between two reinforcing bars in a concrete structure.

    • Lapping length is important for ensuring the strength and stability of a concrete structure.

    • It is necessary to provide sufficient lapping length to ensure proper transfer of stresses between the two bars.

    • The lapping length required depends on the diameter of the bars, the grade of the steel, and the design requirements.

    • For exam...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Selected,good management , excellent

Interview Questionnaire 

3 Questions

  • Q1. Type of job currently doing and special aspects of that
  • Q2. Where difficulty you face and how you overcome on that
  • Q3. What is your innermost desire to be in the next 8 years?

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is ratio of M25 grade
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2.

    • The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for various applications.

    • For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good management system,salary time to time,

Interview Questionnaire 

1 Question

  • Q1. BBS ka full Form
  • Ans. 

    BBS stands for Bar Bending Schedule.

    • BBS is a document that provides details of reinforcement steel bars required for a construction project.

    • It includes information about the diameter, length, and shape of each bar, as well as the number of bars needed.

    • BBS helps in estimating the quantity of steel required and ensures proper placement and arrangement of reinforcement in the structure.

    • It is prepared based on the structur...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 30 minutes. The interviewer wanted to test both my knowledge and Communication skills. Most of the questions asked to me were related to my B.tech Civil Engineering Topic discuss was very good performance

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to my studies

Interview Preparation Tips

Interview preparation tips for other job seekers - Related to my CV. It was my first off campus interview, and I think I did pretty well for a fresher.

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

BIC Contracting Interview FAQs

How many rounds are there in BIC Contracting Senior Project Site Engineer interview?
BIC Contracting interview process usually has 1 rounds. The most common rounds in the BIC Contracting interview process are Technical.

Tell us how to improve this page.

BIC Contracting Senior Project Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 698 Interviews
Tata Projects Interview Questions
4.3
 • 405 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
AECOM Interview Questions
4.3
 • 110 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
View all
Civil Site Engineer
7 salaries
unlock blur

₹12.1 L/yr - ₹16 L/yr

Document Controller
6 salaries
unlock blur

₹1 L/yr - ₹8.5 L/yr

Construction Management
5 salaries
unlock blur

₹35 L/yr - ₹60 L/yr

Civil Supervisor
5 salaries
unlock blur

₹6.7 L/yr - ₹11.1 L/yr

Mechanical Engineer
4 salaries
unlock blur

₹3 L/yr - ₹30 L/yr

Explore more salaries
Compare BIC Contracting with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview