Filter interviews by
Be the first one to contribute and help others!
I was interviewed in Dec 2024.
I applied via Naukri.com and was interviewed in Dec 2024. There were 3 interview rounds.
Diploma mechanical engineering 2022
posted on 12 Jan 2025
Group discussion meeting on my job and my work
posted on 22 Jan 2025
I was interviewed in Dec 2024.
posted on 22 Sep 2022
I applied via Walk-in and was interviewed before Sep 2021. There was 1 interview round.
Some electrical project ideas for in house improvements include installing smart home technology, upgrading lighting fixtures, and adding solar panels.
Install smart home technology for energy efficiency and convenience
Upgrade lighting fixtures to improve aesthetics and energy efficiency
Add solar panels to reduce electricity costs and environmental impact
Sap pm and electrically
I was interviewed in Dec 2024.
I applied via Job Fair and was interviewed in Nov 2024. There were 2 interview rounds.
Over all security responsibility
posted on 2 Oct 2024
The HR policy is very bad. The notice period there is 2 months for Assistant Manager and 3 months for Deputy Manager. If you do not serve the notice period, they deduct the gross salary and not the basic salary. And they do not give any full and final breakup certificate.
Because the company I was joining had bought my notice period. But Bharat Wire did not give me any full and final breakup certificate. Due to this, the company I joined did not give me the notice period money. My amount was about 83000 rupees. My money got lost because of Bharat Wire.
I emailed HR many times. But HR did not reply to my email.
If I talk specifically about the electrical department, there is rule of two people who talk like non-technical. And they do not have the manners to talk to seniors and juniors. Only those who do not know anything and who can bear their abuses are working there.
I would especially refuse to join this electrical department as long as these people are there. Even if you join there, within a week you will feel that we took a wrong decision. And you will be mentally stressed. Because you will be tortured so much. The electrical department has a completely toxic environment.
The canteen food is absolutely bad. Even dogs would not like such food.
Bharat Wire had a very good image in the market long ago. People wanted to join this company.
but today no one wants to join Bharat Wire whoever comes to know about it. That is why before joining, people connect with people on LinkedIn and take feedback, which is also right.
Modes of heat transfer include conduction, convection, and radiation.
Conduction: Heat transfer through direct contact between particles. Example: Touching a hot pan.
Convection: Heat transfer through the movement of fluids (liquids or gases). Example: Boiling water.
Radiation: Heat transfer through electromagnetic waves. Example: Feeling the warmth of the sun.
An addendum circle is a circle that is tangent to two other circles and intersects them at their points of tangency.
Addendum circle is commonly used in gear design to determine the correct size of gears.
It is tangent to two other circles, known as the base circles, and intersects them at their points of tangency.
The addendum circle is larger in diameter than the base circles, allowing for the teeth of the gears to mesh
Rankine cycle is a thermodynamic cycle used in steam power plants to generate electricity.
Rankine cycle involves four processes: compression, heating, expansion, and cooling.
Steam is compressed in a pump, heated in a boiler to high temperature and pressure, expanded in a turbine, and then cooled in a condenser.
The cycle is used in steam power plants to convert thermal energy into mechanical work, which is then used to
based on 4 reviews
Rating in categories
Accounts Manager
3
salaries
| ₹6.6 L/yr - ₹7 L/yr |
Tata Steel
JSW Steel
Jindal Stainless
Jindal Saw