Filter interviews by
Pitch of a micrometer refers to the distance moved by the spindle per revolution of the thimble.
Pitch is typically engraved on the frame of the micrometer as the distance moved by the spindle for one complete revolution of the thimble.
It is used to calculate the measurement resolution of the micrometer.
For example, if the pitch is 0.5mm, then each division on the thimble corresponds to 0.01mm of movement of the spindle
Yes, it is possible to punch a hole with a diameter of 3mm in a sheet with a thickness of 4mm using a press tool.
The hole diameter should be smaller than the sheet thickness to ensure successful punching.
Consider the material of the sheet and the type of press tool being used for punching.
Ensure proper alignment and clearance for the punching process to avoid any issues.
Example: Using a hydraulic press with a sharp pun...
Pitch of a micrometer refers to the distance moved by the spindle per revolution of the thimble.
Pitch is typically expressed in millimeters or inches per revolution.
It is used to calculate the measurement resolution of the micrometer.
For example, a micrometer with a pitch of 0.5mm will move 0.5mm for each full rotation of the thimble.
Yes, a sheet thickness of 4mm can be punched.
The punching process involves using a tool to create a hole or cut in the material.
The ability to punch a 4mm thick sheet will depend on the type of punching machine and the material being punched.
For thicker sheets, a more powerful punching machine may be required.
Examples of punching machines include turret punch presses and hydraulic punch presses.
I was interviewed in May 2024.
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
Governor, valve, and welding types are important components in engineering.
Governor: device used to control the speed of an engine or machine
Valve: device used to control the flow of fluids or gases
Welding types: various methods of joining metals together, such as MIG, TIG, and arc welding
A petrol engine is an internal combustion engine that runs on petrol fuel.
Petrol engines use spark plugs to ignite the fuel-air mixture
They have higher power output compared to diesel engines
Examples include inline-four, V6, and V8 petrol engines
A four stroke engine is an internal combustion engine that completes four separate strokes (intake, compression, power, exhaust) in two crankshaft revolutions.
Intake stroke: Fuel-air mixture is drawn into the cylinder.
Compression stroke: Mixture is compressed by the piston.
Power stroke: Mixture is ignited, expanding and pushing the piston down.
Exhaust stroke: Exhaust gases are expelled from the cylinder.
Bharat Seats interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Performance rate is 97%
Performance rate = 100% - (100% - 97%) = 3%
Performance rate = 3%
This means the actual performance is 3% below the planned performance
Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.
Implement strict quality control measures to catch errors early on
Identify root causes of rework to address underlying issues
Provide training to employees to improve skills and reduce errors
Continuously monitor and improve processes to prevent rework
Utilize data analys
I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.
Setting clear goals to stay focused and motivated
Prioritizing tasks based on importance and deadlines
Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix
Seeking ways to streamline processes through automation or optimiz...
Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.
Implement automation to reduce manual labor requirements
Optimize processes to increase efficiency and reduce labor hours
Outsource non-core tasks to lower cost regions or specialized vendors
Cross-train employees to handle multiple roles and tasks effectively
To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.
Implement standardized work procedures to ensure consistency and efficiency during changeovers
Improve equipment reliability to reduce downtime and increase productivity
Optimize scheduling to minimize changeover frequency and maximize production time
Minimize setup times by...
DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.
DWM involves creating daily schedules for production activities
It includes assigning tasks to team members and monitoring progress
Regularly updating and adjusting plans based on production needs
Examples: setting up daily production targets, coordinating with different department
Performance is dependent on various factors, not just availability.
Performance is influenced by factors such as skill level, experience, resources, and support.
Availability is just one aspect that can impact performance, but it is not the sole determinant.
For example, even if availability is high, performance may still be low if other factors are not optimal.
Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.
Listen actively to the customer's complaint without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue to understand the root cause
Offer a solution that addresses the customer's concerns
Follow up with the customer to ensure their satisfaction with th
To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.
Prioritize safety of personnel and equipment
Assess the situation to understand the root cause
Take corrective actions promptly to mitigate the abnormal condition
Communicate effectively with team members and stakeholders
Implement preventive measures to avoid recurrence
I applied via Campus Placement
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
To control rework & rejection, implement quality control measures, train employees, analyze root causes, and continuously improve processes.
Implement quality control measures to catch defects early on
Train employees on proper procedures and quality standards
Analyze root causes of rework and rejection to address underlying issues
Continuously improve processes based on data and feedback
Use tools like Six Sigma or Lean Ma...
Top trending discussions
The duration of Bharat Seats interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 38 interviews
Interview experience
based on 331 reviews
Rating in categories
Senior Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
91
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Faurecia
Lear Corporation
Adient
Samvardhana Motherson Group