Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Performance rate is 97%
Performance rate = 100% - (100% - 97%) = 3%
Performance rate = 3%
This means the actual performance is 3% below the planned performance
Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.
Implement strict quality control measures to catch errors early on
Identify root causes of rework to address underlying issues
Provide training to employees to improve skills and reduce errors
Continuously monitor and improve processes to prevent rework
Utilize data analys
I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.
Setting clear goals to stay focused and motivated
Prioritizing tasks based on importance and deadlines
Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix
Seeking ways to streamline processes through automation or optimiz...
Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.
Implement automation to reduce manual labor requirements
Optimize processes to increase efficiency and reduce labor hours
Outsource non-core tasks to lower cost regions or specialized vendors
Cross-train employees to handle multiple roles and tasks effectively
To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.
Implement standardized work procedures to ensure consistency and efficiency during changeovers
Improve equipment reliability to reduce downtime and increase productivity
Optimize scheduling to minimize changeover frequency and maximize production time
Minimize setup times by...
DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.
DWM involves creating daily schedules for production activities
It includes assigning tasks to team members and monitoring progress
Regularly updating and adjusting plans based on production needs
Examples: setting up daily production targets, coordinating with different department
Performance is dependent on various factors, not just availability.
Performance is influenced by factors such as skill level, experience, resources, and support.
Availability is just one aspect that can impact performance, but it is not the sole determinant.
For example, even if availability is high, performance may still be low if other factors are not optimal.
Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.
Listen actively to the customer's complaint without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue to understand the root cause
Offer a solution that addresses the customer's concerns
Follow up with the customer to ensure their satisfaction with th
To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.
Prioritize safety of personnel and equipment
Assess the situation to understand the root cause
Take corrective actions promptly to mitigate the abnormal condition
Communicate effectively with team members and stakeholders
Implement preventive measures to avoid recurrence
Top trending discussions
posted on 16 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
To close customer complaints, actively listen to their concerns, empathize with their frustrations, offer a solution or compensation, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their frustrations and acknowledge their feelings
Offer a solution or compensation to resolve the issue
Follow up with the customer to ensure their satisfaction
To resolve the issue, identify the root cause, develop a plan, and implement solutions.
Identify the root cause of the issue
Develop a plan to address the issue
Implement solutions based on the plan
Monitor and evaluate the effectiveness of the solutions
Make necessary adjustments if needed
Part programming for VMC and tool selection
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc
posted on 5 Apr 2025
I appeared for an interview before Apr 2024, where I was asked the following questions.
I applied via Job Portal and was interviewed in Apr 2024. There was 1 interview round.
The question seems to be asking about a specific topic or concept, possibly related to engineering terminology or processes.
Try to understand the context of the question and provide a relevant response.
Consider the keywords 'ellame' and 'eppome' for any clues.
If unsure, ask for clarification or provide a general overview of engineering principles.
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Types of injection molding machines include hydraulic, electric, and hybrid machines.
Hydraulic injection molding machines use hydraulic systems to generate the necessary pressure for the injection process.
Electric injection molding machines are more energy efficient and precise compared to hydraulic machines.
Hybrid injection molding machines combine the benefits of both hydraulic and electric machines.
Examples: Arburg ...
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
106
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Senior Engineer
106
salaries
| ₹3 L/yr - ₹8.3 L/yr |
Junior Engineer
61
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Diploma Trainee Engineer
49
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Production Engineer
48
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
ZF Steering Gear
Greaves Cotton
Goodyear
Shivam Autotech