Filter interviews by
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
To control rework & rejection, implement quality control measures, train employees, analyze root causes, and continuously improve processes.
Implement quality control measures to catch defects early on
Train employees on proper procedures and quality standards
Analyze root causes of rework and rejection to address underlying issues
Continuously improve processes based on data and feedback
Use tools like Six Sigma or Lean Ma...
Top trending discussions
OEE is calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Parts Produced by Total Parts Produced.
Multiply Availability, Performance, and Quality to get Overall Equipment Effectiveness (OEE).
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Oct 2021. There were 4 interview rounds.
Petrol engines use spark ignition while diesel engines use compression ignition.
Petrol engines use spark plugs to ignite the fuel-air mixture, while diesel engines rely on compression to ignite the fuel.
Petrol engines typically have higher RPM (revolutions per minute) compared to diesel engines.
Diesel engines are more fuel-efficient than petrol engines.
Petrol engines are generally lighter and more compact than diesel e...
Types of brakes include disc brakes, drum brakes, regenerative brakes, and hydraulic brakes.
Disc brakes use calipers to squeeze brake pads against a disc rotor.
Drum brakes use brake shoes that press against the inside of a drum.
Regenerative brakes convert kinetic energy into electrical energy to recharge the battery.
Hydraulic brakes use fluid pressure to apply force to the brake pads or shoes.
I applied via campus placement at National Institute of Foundry and Forge Technology, Ranchi and was interviewed before Mar 2023. There were 2 interview rounds.
Questions related to heat treatment
My short-term goal is to learn as much as possible and contribute to the team. My long-term goal is to become a senior production engineer and lead a team.
Short-term goal: Learn as much as possible and contribute to the team
Long-term goal: Become a senior production engineer and lead a team
Short-term goal can include attending training sessions, shadowing senior engineers, and taking on new projects
Long-term goal can i...
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 3 interview rounds.
posted on 16 Jan 2025
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
based on 8 reviews
Rating in categories
Assistant Manager
100
salaries
| ₹5.1 L/yr - ₹12.1 L/yr |
Senior Engineer
85
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
Junior Engineer
60
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Diploma Trainee Engineer
50
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Production Engineer
49
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Faurecia
Lear Corporation
Adient
Samvardhana Motherson Group