I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
QMS stands for Quality Management System.
QMS is a set of policies, processes, and procedures that ensure quality in products or services.
It helps in meeting customer requirements and regulatory standards.
QMS includes activities like quality planning, quality control, quality assurance, and quality improvement.
ISO 9001 is a popular QMS standard used by organizations worldwide.
ISO is a generic standard for quality management while IATF is a specific standard for automotive industry.
ISO focuses on customer satisfaction and continuous improvement while IATF focuses on specific requirements for automotive industry
IATF requires compliance with ISO 9001 and adds additional requirements specific to automotive industry
IATF certification is required for automotive suppliers to do business with major...
Verification ensures that the product is built according to the requirements while validation ensures that the product meets the customer's needs.
Verification checks if the product is built correctly while validation checks if the right product is built.
Verification is a process of evaluating documents, plans, code, and specifications while validation is a process of evaluating the final product.
Verification is done be...
FMEA scoring is a method to prioritize risks based on their severity, occurrence, and detection.
FMEA scoring helps identify high-risk areas that require immediate attention.
The scoring is based on three factors: severity, occurrence, and detection.
Each factor is scored on a scale of 1-10, with 10 being the highest risk.
The scores are multiplied to give a risk priority number (RPN).
The higher the RPN, the higher the pri...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 28 Feb 2022
posted on 25 Dec 2023
I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.
posted on 29 Jan 2024
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
Production Engineer
188
salaries
| ₹1.3 L/yr - ₹5.1 L/yr |
Quality Engineer
108
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Production Supervisor
102
salaries
| ₹2.1 L/yr - ₹5.1 L/yr |
Junior Engineer
55
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Diploma Mechanical Engineer
54
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda