Upload Button Icon Add office photos

BGR Energy Systems

Compare button icon Compare button icon Compare

Filter interviews by

BGR Energy Systems Interview Questions, Process, and Tips

Updated 24 Feb 2025

Top BGR Energy Systems Interview Questions and Answers

View all 16 questions

BGR Energy Systems Interview Experiences

Popular Designations

44 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basics, previous company salary details, Family background.
Round 3 - Technical 

(1 Question)

  • Q1. Factory act1948 ,bocw act ,AEFR 1996.

Interview Preparation Tips

Interview preparation tips for other job seekers - Totally 4 round:
1)HR Round
2)Manger Round
3) Company safety Engineer
4)VP
Basic department information, previous experience & about your family background.

Safety Engineer Interview Questions asked at other Companies

Q1. What is the safe distance of excavations from a a truck
View answer (6)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Group ke sbhi senior ki advice and permission jruri h

Round 3 - Assignment 

Company me assignment hona chahiye and good company

Round 4 - Technical 

(4 Questions)

  • Q1. Interview questions very easy language solve the question introduction join bpo
  • Q2. Interview questions very good and easy answer and bina hoples hue Dene chahiye and good work
  • Q3. Kisi bhi trh ke topic se questions puche ja skte h or onka good answers Dena jruri h
  • Q4. Company join krne pr vha ki sbhi tor treke sikhke onhe follow Krna chahiye

Interview Preparation Tips

Interview preparation tips for other job seekers - Job ki need hone pr job ki Jaye to better h and company ka management accha h

Data Entry Operator Interview Questions asked at other Companies

Q1. What is skills matrix of Return center Department?
View answer (44)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Sbc check and basic engineering
  • Q2. Bending moment and shear force diagram. Various check for the structure. Analysis methodology

Interview Preparation Tips

Interview preparation tips for other job seekers - whatever u know explain it clearly

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Apr 2023.

Round 1 - Technical 

(4 Questions)

  • Q1. Please tell about your recently completed project.?
  • Q2. What type problem you have facing during entire completion of project?
  • Q3. How can manage your subcontractor and stake holder?
  • Ans. 

    Manage subcontractors and stakeholders by clear communication, setting expectations, regular updates, and addressing concerns promptly.

    • Establish clear communication channels with subcontractors and stakeholders

    • Set clear expectations and goals for the project

    • Provide regular updates on project progress and milestones

    • Address any concerns or issues promptly to maintain good relationships

    • Hold regular meetings to discuss pro...

  • Answered by AI
  • Q4. How to manage client and if clint ask to work beyond the your BOQ and how will take this qty into the billing or amendment.
Round 2 - HR 

(2 Questions)

  • Q1. What is your future Goal?
  • Q2. How to manage your site staff and Your Reporting Boss?

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare these

Senior Electrical Engineer Interview Questions asked at other Companies

Q1. 1. What IEC standard you are using for designing the panels, for selection of switchgear.
View answer (1)

BGR Energy Systems interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (3)

 Deputy Manager

 (3)

 Senior Engineer

 (2)

 Civil Engineer

 (2)

 Design Engineer

 (2)

 Safety Engineer

 (2)

 Senior Manager

 (2)

 Construction Management

 (1)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Problems you've faced during construction

Round 3 - Technical 

(1 Question)

  • Q1. Knowledge in projects and execution process
Round 4 - HR 

(1 Question)

  • Q1. Salary, why change job

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary is on time! If have time you may find a better opportunity

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Get interview-ready with Top BGR Energy Systems Interview Questions

I applied via Naukri.com

Round 1 - One-on-one 

(1 Question)

  • Q1. Telephonic interview was conducted from Head office
Round 2 - Technical 

(1 Question)

  • Q1. On site interview was conducted.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear n confident. Knowledge of field instruments n process is must

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. What is multiple representation and how to make
  • Ans. 

    Multiple representation is the concept of presenting information in different ways to enhance understanding and communication.

    • Multiple representation involves using various formats such as text, images, graphs, and diagrams to convey information.

    • It helps cater to different learning styles and preferences of individuals.

    • For example, explaining a complex process through a combination of written instructions, visual diagr...

  • Answered by AI
  • Q2. What are the types of OPC in detail
  • Ans. 

    OPC stands for OLE for Process Control and includes OPC DA, OPC UA, and OPC XML-DA.

    • OPC DA (Data Access) - used for real-time data access and historical data access

    • OPC UA (Unified Architecture) - a more secure and reliable version of OPC, supports various platforms and devices

    • OPC XML-DA - allows communication between OPC servers and clients using XML-based data exchange

    • OPC HDA (Historical Data Access) - used for accessi

  • Answered by AI
  • Q3. Tell me yourself
  • Q4. Tool test using system
  • Ans. 

    Tool test using system involves evaluating the performance and functionality of a tool within a specific system.

    • Identify the specific system in which the tool will be used

    • Define the criteria for evaluating the tool's performance

    • Conduct tests to assess how the tool functions within the system

    • Analyze the results to determine if the tool meets the requirements

    • Iterate on the design based on test results

  • Answered by AI
  • Q5. If a normal or moderate diagram how many hours to create and finish
  • Ans. 

    The time required to create and finish a normal or moderate diagram varies depending on complexity, experience, and tools used.

    • The hours required can range from a few hours to a few days, depending on the complexity of the diagram.

    • Experience with the specific tools and software can significantly impact the time needed to create the diagram.

    • Collaboration with team members or stakeholders may also affect the timeline for...

  • Answered by AI

Skills evaluated in this interview

Process Designer Interview Questions asked at other Companies

Q1. what is P&ID ? what is PFD? draw P&ID diagram or sketch prepared by engineer.
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Brief about yourself
  • Ans. Past co experience, edu background, contribution in previos ob
  • Answered Anonymously
  • Q2. How would you handle situation with subcontractor if you notice substandard work?
  • Q3. Would review the work and carryout the root cause analysis and decide corrective action.

Interview Preparation Tips

Topics to prepare for BGR Energy Systems General Manager Project interview:
  • Team Management
  • Technical
Interview preparation tips for other job seekers - Be bold and confident in responding to queries.

General Manager Project Interview Questions asked at other Companies

Q1. What is the bending radius of EHV cables?
View answer (2)

I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All about previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Tool test with Invebtor software

Interview Preparation Tips

Interview preparation tips for other job seekers - Yiu need some experience related to Heat exchanger systems and prrssure vessels to select easily. Also need Invebtor experience.

Mechanical Engg. Design Interview Questions asked at other Companies

Q1. What are the Drawing softwares you're aware of And How much relevant experience you have in for each software
View answer (3)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic construction techniques to be known
  • Ans. 

    Basic construction techniques include excavation, foundation construction, concrete pouring, framing, and finishing.

    • Excavation: Digging and removing soil to prepare the site for construction.

    • Foundation construction: Building the base of the structure to provide stability.

    • Concrete pouring: Pouring and leveling concrete to create floors, walls, and other structural elements.

    • Framing: Constructing the skeletal framework of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be clear in your project need before reach the interview..

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

BGR Energy Systems Interview FAQs

How many rounds are there in BGR Energy Systems interview?
BGR Energy Systems interview process usually has 2-3 rounds. The most common rounds in the BGR Energy Systems interview process are Technical, Resume Shortlist and HR.
How to prepare for BGR Energy Systems interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at BGR Energy Systems. The most common topics and skills that interviewers at BGR Energy Systems expect are AutoCAD, PLC, Design Engineering, RCC and Civil Design.
What are the top questions asked in BGR Energy Systems interview?

Some of the top questions asked at the BGR Energy Systems interview -

  1. How many workers would you engage for 1 cum concrete? How much binding wire wou...read more
  2. How can manage your subcontractor and stake hold...read more
  3. If a normal or moderate diagram how many hours to create and fin...read more
How long is the BGR Energy Systems interview process?

The duration of BGR Energy Systems interview process can vary, but typically it takes about 2-4 weeks to complete.

Tell us how to improve this page.

BGR Energy Systems Interview Process

based on 39 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
Adani Power Interview Questions
3.9
 • 218 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
View all

BGR Energy Systems Reviews and Ratings

based on 838 reviews

3.8/5

Rating in categories

3.4

Skill development

3.7

Work-life balance

3.2

Salary

3.5

Job security

3.4

Company culture

2.9

Promotions

3.5

Work satisfaction

Explore 838 Reviews and Ratings
Deputy Manager
218 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
188 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
93 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy General Manager
53 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare BGR Energy Systems with

Thermax Limited

4.1
Compare

Kirloskar Brothers

3.8
Compare

Larsen & Toubro Limited

4.0
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview