Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.
Group ke sbhi senior ki advice and permission jruri h
Company me assignment hona chahiye and good company
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
I was interviewed before Apr 2023.
Manage subcontractors and stakeholders by clear communication, setting expectations, regular updates, and addressing concerns promptly.
Establish clear communication channels with subcontractors and stakeholders
Set clear expectations and goals for the project
Provide regular updates on project progress and milestones
Address any concerns or issues promptly to maintain good relationships
Hold regular meetings to discuss pro...
BGR Energy Systems interview questions for popular designations
Problems you've faced during construction
Get interview-ready with Top BGR Energy Systems Interview Questions
I applied via Naukri.com
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
Multiple representation is the concept of presenting information in different ways to enhance understanding and communication.
Multiple representation involves using various formats such as text, images, graphs, and diagrams to convey information.
It helps cater to different learning styles and preferences of individuals.
For example, explaining a complex process through a combination of written instructions, visual diagr...
OPC stands for OLE for Process Control and includes OPC DA, OPC UA, and OPC XML-DA.
OPC DA (Data Access) - used for real-time data access and historical data access
OPC UA (Unified Architecture) - a more secure and reliable version of OPC, supports various platforms and devices
OPC XML-DA - allows communication between OPC servers and clients using XML-based data exchange
OPC HDA (Historical Data Access) - used for accessi
Tool test using system involves evaluating the performance and functionality of a tool within a specific system.
Identify the specific system in which the tool will be used
Define the criteria for evaluating the tool's performance
Conduct tests to assess how the tool functions within the system
Analyze the results to determine if the tool meets the requirements
Iterate on the design based on test results
The time required to create and finish a normal or moderate diagram varies depending on complexity, experience, and tools used.
The hours required can range from a few hours to a few days, depending on the complexity of the diagram.
Experience with the specific tools and software can significantly impact the time needed to create the diagram.
Collaboration with team members or stakeholders may also affect the timeline for...
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
Basic construction techniques include excavation, foundation construction, concrete pouring, framing, and finishing.
Excavation: Digging and removing soil to prepare the site for construction.
Foundation construction: Building the base of the structure to provide stability.
Concrete pouring: Pouring and leveling concrete to create floors, walls, and other structural elements.
Framing: Constructing the skeletal framework of...
Top trending discussions
The duration of BGR Energy Systems interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 39 interviews
Interview experience
based on 838 reviews
Rating in categories
Deputy Manager
218
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy General Manager
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
Kirloskar Brothers
Larsen & Toubro Limited
BHEL