Bedmutha Group Interview Questions and Answers

Updated 24 Aug 2021

Bedmutha Group Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2021

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About reconducting work in power transmission and distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence level high

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working

I applied via Recruitment Consultant and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. How I can join Ashoka build on LTD. For senior highway engineer
  • Q2. By interview
  • Q3. Salary is continueous monthly
  • Q4. We are chance for me to ahead a company progressful
  • Q5. I am interesting for interview before joining
  • Q6. Yes

Interview Preparation Tips

Interview preparation tips for other job seekers - By. Face to face

I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell about your experience with family details

Interview Preparation Tips

Interview preparation tips for other job seekers - Talent acquisition team is Very good and employee oriented organization.

I applied via Company Website and was interviewed in Oct 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Yes my interview has a technical.

Interview Preparation Tips

Interview preparation tips for other job seekers - This my interview has a technical and communication skills both test to my interview time.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How many PTR engaged at BT laying
  • Ans. 

    I don't have the available data to answer this question.

    • Sorry, I don't have access to the current data on the number of PTR engaged at BT laying.

    • I suggest checking with the relevant department or team for the latest information.

  • Answered by AI
  • Q2. 2 nos are engaged at BT lalying
  • Q3. Crusher make model and process of crushing ?
  • Ans. 

    The crusher make model and process of crushing depend on the type of material being crushed.

    • The make and model of the crusher will vary depending on the application and material being crushed.

    • The process of crushing also varies depending on the material and desired output size.

    • For example, a jaw crusher may be used for primary crushing of hard rock, while a cone crusher is more suitable for secondary or tertiary crushi...

  • Answered by AI
  • Q4. Puzolona 300TPh

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on road construction equipments

Interview Questionnaire 

1 Question

  • Q1. Everything from your CV

Interview Preparation Tips

Interview preparation tips for other job seekers - I gave interview on Dec Month, and got selection notification on Feb.

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Tell us how to improve this page.

    Bedmutha Group Interview Process

    based on 1 interview

    Interview experience

    5
      
    Excellent
    View more

    Interview Questions from Similar Companies

    L&T Construction Interview Questions
    4.0
     • 715 Interviews
    Tata Projects Interview Questions
    4.2
     • 413 Interviews
    KEC International Interview Questions
    4.1
     • 289 Interviews
    Dilip Buildcon Interview Questions
    4.0
     • 139 Interviews
    G R Infraprojects Interview Questions
    4.1
     • 130 Interviews
    View all

    Bedmutha Group Reviews and Ratings

    based on 8 reviews

    4.1/5

    Rating in categories

    3.8

    Skill development

    4.0

    Work-life balance

    3.8

    Salary

    4.0

    Job security

    3.9

    Company culture

    4.0

    Promotions

    4.1

    Work satisfaction

    Explore 8 Reviews and Ratings
    Senior Engineer
    4 salaries
    unlock blur

    ₹3.1 L/yr - ₹4.4 L/yr

    Project Manager
    4 salaries
    unlock blur

    ₹5.6 L/yr - ₹7.2 L/yr

    Shift Incharge
    4 salaries
    unlock blur

    ₹3 L/yr - ₹3.7 L/yr

    Deputy Manager-Electrical
    3 salaries
    unlock blur

    ₹4.1 L/yr - ₹8.2 L/yr

    Explore more salaries
    Compare Bedmutha Group with

    Larsen & Toubro Limited

    4.0
    Compare

    L&T Construction

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Kalpataru Projects International

    4.2
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview