  • Q1. About reconducting work in power transmission and distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence level high

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Columns staircase foundation
  • Q2. Beam one way slab ,two way slav
  • Ans. 

    One way slab is supported on two opposite sides, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads predominantly in one direction.

    • Two way slab is designed to carry loads in both directions.

    • One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.

    • Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Site related experience bracket wall
  • Q2. Survey auto level total station
Round 3 - One-on-one 

(2 Questions)

  • Q1. Bbs, drawing reading
  • Q2. Stairs drawing reading
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full form of SBC
  • Q2. Density of concrete
Round 2 - Technical 

(1 Question)

  • Q1. Diameter of TBM
Round 3 - HR 

(1 Question)

  • Q1. Tell me something about yourself
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete workebility test
  • Ans. 

    Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.

  • Answered Anonymously
  • Q2. Concrete strength
  • Q3. Suttring work .safety working at site
  • Q4. Gas pipeline work
  • Ans. 

    Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.

    • Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.

    • Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.

    • Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...

  • Answered by AI
  • Q5. Auto level work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly work done
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Cement density and aggregate
  • Q2. Cement set time

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company NCC LIMITED
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is your salary.
  • Q2. Doing all over project.
  • Q3. Notice period of your current company
Round 3 - Technical 

(4 Questions)

  • Q1. Cement consumption of M20 ratio
  • Ans. 

    Cement consumption of M20 concrete mix ratio is 360 kg/m3.

    • M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)

    • Cement consumption for 1 m3 of M20 concrete is 360 kg

    • To calculate total cement consumption, multiply 360 kg by the volume of concrete needed

  • Answered by AI
  • Q2. Extra item add in billing.
  • Ans. 

    Extra items added in billing should be justified with proper documentation and approval.

    • Ensure that the extra item was actually used on the project

    • Check if the extra item was approved by the client or project manager

    • Document the reason for adding the extra item in the billing

    • Provide evidence such as photos or receipts to support the inclusion of the extra item

  • Answered by AI
  • Q3. Rate analysis of various item
  • Ans. 

    Rate analysis involves calculating the cost of various items in a construction project.

    • Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.

    • It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.

    • Rate analysis is essential for accurate budgeting and cost estimation in construction projects.

    • For example, in...

  • Answered by AI
  • Q4. Price ecclaration
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Structure MJB. MNB

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Site Engineer interview:
  • Structure
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Assignment 

Sanik school G+2 , Quantity survey, estimation and costing

Round 3 - Technical 

(1 Question)

  • Q1. Estimation and costing,Bar Bending schedule, Quantity surveyor

Tell us how to improve this page.

Senior Engineer
4 salaries
unlock blur

₹3.1 L/yr - ₹4.4 L/yr

Project Manager
4 salaries
unlock blur

₹5.6 L/yr - ₹7.2 L/yr

Shift Incharge
4 salaries
unlock blur

₹3 L/yr - ₹3.7 L/yr

Deputy Manager-Electrical
3 salaries
unlock blur

₹4.1 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Bedmutha Group with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview