Upload Button Icon Add office photos

Filter interviews by

BD Buildcon Interview Questions, Process, and Tips

Updated 22 Feb 2025

Top BD Buildcon Interview Questions and Answers

BD Buildcon Interview Experiences

Popular Designations

3 interviews found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Rolling margin of TMT bars?
  • Ans. 

    Rolling margin of TMT bars refers to the difference between the theoretical weight and the actual weight of the bars after rolling.

    • Rolling margin is calculated by subtracting the actual weight of the TMT bar from the theoretical weight.

    • It is important to control the rolling margin to ensure the quality and consistency of the TMT bars.

    • For example, if the theoretical weight of a TMT bar is 10 kg and the actual weight aft...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Your salary expectation?
  • Q2. 2. Mode of Measurement of Plastering work?
  • Ans. 

    Plastering work is typically measured in square meters or square feet.

    • Plastering work is usually measured in terms of area covered, such as square meters or square feet.

    • The thickness of the plaster is also taken into account when measuring the work.

    • For example, if a wall is plastered with a thickness of 15mm, the measurement would be different compared to a wall plastered with 20mm thickness.

  • Answered by AI
  • Q3. 3. List of IS Code use of Billing work
  • Ans. 

    IS Codes are used for standardization and quality assurance in billing work.

    • IS 456:2000 - Code of practice for plain and reinforced concrete

    • IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement

    • IS 3370:1965 - Code of practice for concrete construction

    • IS 1200:1976 - Method of measurement of building and civil engineering works

    • IS 7272:1974 - Code of practice for construction of reinforced c

  • Answered by AI
  • Q4. 4. Wastage of TMT,Concrete
  • Ans. 

    Wastage of TMT and concrete can occur due to improper handling, inaccurate measurements, and lack of proper planning.

    • Improper handling of materials during transportation and storage can lead to wastage.

    • Inaccurate measurements during cutting and bending of TMT bars can result in wastage.

    • Lack of proper planning and coordination among the construction team can also contribute to wastage.

    • Using excess concrete than required...

  • Answered by AI

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Interview Questions & Answers

user image Anonymous

posted on 22 Feb 2025

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Face to face taking 

(3 Questions)

  • Q1. What is your name
  • Q2. Your experience of years
  • Q3. Your permanent address

I applied via Naukri.com and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Concrete technology

Interview Preparation Tips

Interview preparation tips for other job seekers - Gujrat

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Interview questions from similar companies

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

BD Buildcon Interview FAQs

How many rounds are there in BD Buildcon interview?
BD Buildcon interview process usually has 2 rounds. The most common rounds in the BD Buildcon interview process are Resume Shortlist, Technical and HR.
How to prepare for BD Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at BD Buildcon. The most common topics and skills that interviewers at BD Buildcon expect are Bar Bending Schedule, Communication Skills, Contract Labour Act, Contract Labour Management and Design.
What are the top questions asked in BD Buildcon interview?

Some of the top questions asked at the BD Buildcon interview -

  1. 2. Mode of Measurement of Plastering wo...read more
  2. 3. List of IS Code use of Billing w...read more
  3. 4. Wastage of TMT,Concr...read more

Tell us how to improve this page.

BD Buildcon Interview Process

based on 3 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

BD Buildcon Reviews and Ratings

based on 24 reviews

3.8/5

Rating in categories

3.4

Skill development

3.1

Work-life balance

3.8

Salary

2.9

Job security

3.2

Company culture

3.0

Promotions

3.3

Work satisfaction

Explore 24 Reviews and Ratings
Civil Site Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer Mechanical
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare BD Buildcon with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview