Rolling margin of TMT bars refers to the difference between the theoretical weight and the actual weight of the bars after rolling.
Rolling margin is calculated by subtracting the actual weight of the TMT bar from the theoretical weight.
It is important to control the rolling margin to ensure the quality and consistency of the TMT bars.
For example, if the theoretical weight of a TMT bar is 10 kg and the actual weight aft...
Plastering work is typically measured in square meters or square feet.
Plastering work is usually measured in terms of area covered, such as square meters or square feet.
The thickness of the plaster is also taken into account when measuring the work.
For example, if a wall is plastered with a thickness of 15mm, the measurement would be different compared to a wall plastered with 20mm thickness.
IS Codes are used for standardization and quality assurance in billing work.
IS 456:2000 - Code of practice for plain and reinforced concrete
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 3370:1965 - Code of practice for concrete construction
IS 1200:1976 - Method of measurement of building and civil engineering works
IS 7272:1974 - Code of practice for construction of reinforced c
Wastage of TMT and concrete can occur due to improper handling, inaccurate measurements, and lack of proper planning.
Improper handling of materials during transportation and storage can lead to wastage.
Inaccurate measurements during cutting and bending of TMT bars can result in wastage.
Lack of proper planning and coordination among the construction team can also contribute to wastage.
Using excess concrete than required...
I applied via Naukri.com and was interviewed before Jun 2020. There was 1 interview round.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
posted on 4 May 2019
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
based on 3 interviews
Interview experience
based on 24 reviews
Rating in categories
Civil Site Engineer
9
salaries
| ₹2 L/yr - ₹3 L/yr |
Billing Engineer
7
salaries
| ₹4.8 L/yr - ₹7.8 L/yr |
Site Engineer
6
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
Project Manager
5
salaries
| ₹10.5 L/yr - ₹18.5 L/yr |
Quality Engineer
5
salaries
| ₹3 L/yr - ₹3 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
GMR Group