i
Bajaj Electricals
Filter interviews by
posted on 15 Dec 2020
Delays in OEE refer to any unplanned stoppages or interruptions in the production process.
Delays can be caused by equipment breakdowns, material shortages, or operator errors.
They can result in reduced productivity and lower OEE scores.
Examples of delays include machine downtime, changeover time, and waiting for materials or instructions.
Reducing delays is an important part of improving OEE and overall production effic
The pillar in TPM stands for Total Productive Maintenance.
TPM is a systematic approach to equipment maintenance that aims to maximize equipment effectiveness and minimize downtime.
The pillars in TPM are the foundational elements that support the implementation of TPM.
There are typically eight pillars in TPM, including autonomous maintenance, planned maintenance, focused improvement, and education and training.
Each pill...
posted on 17 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
based on 8 reviews
Rating in categories
Assistant Manager
271
salaries
| ₹5.4 L/yr - ₹14.7 L/yr |
Senior Engineer
228
salaries
| ₹3.4 L/yr - ₹8.6 L/yr |
Trade Sales Manager
213
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Deputy Manager
193
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Territory Head
190
salaries
| ₹3.8 L/yr - ₹11.4 L/yr |
Havells
Crompton Greaves Consumer Electricals
V-Guard Industries
Symphony