i
Bajaj Electricals
Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I am very interested in leading and motivating a production team to achieve goals and improve processes.
I have experience in supervising production teams and implementing process improvements.
I enjoy working closely with team members to ensure productivity and quality standards are met.
I am passionate about driving continuous improvement and fostering a positive work environment.
I have successfully led teams to meet pr...
T-code on SAP refers to transaction codes used to access specific functions or programs within the SAP system.
T-codes are shortcuts to access specific functions or programs in SAP.
They are typically alphanumeric codes that can be entered in the command field.
For example, transaction code VA01 is used to create a sales order in SAP.
Users can also create custom transaction codes for frequently used functions.
Fabrication process
Top trending discussions
posted on 3 Aug 2024
I applied via Naukri.com
About production growth and good attachment with employees.
Get same new idea's for company.
Thermodynamics is the study of heat and its relationship with other forms of energy.
Thermodynamics deals with the transfer of energy between systems and their surroundings
It involves the study of temperature, pressure, and volume
The laws of thermodynamics govern the behavior of energy in a system
Thermodynamics has applications in fields such as engineering, physics, and chemistry
Examples of thermodynamic processes incl...
Find the odd one
Maintaining 5S requires consistent effort and training.
Regular training sessions for employees on 5S principles
Establishing a system for regular audits and inspections
Encouraging employee participation and ownership in maintaining 5S
Providing resources and tools to support 5S implementation
Continuously monitoring and improving 5S practices
Recognizing and rewarding employees for their contributions to 5S
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
To produce maximum output, one must optimize production processes, utilize resources efficiently, and motivate the workforce.
Optimize production processes by identifying bottlenecks and implementing solutions
Utilize resources efficiently by minimizing waste and maximizing utilization
Motivate the workforce by providing incentives, training, and a positive work environment
Yes, I am capable of handling the job pressure and long hours.
I have experience working in high-pressure environments and have developed the ability to manage my time effectively.
I am physically fit and able to stand for long periods of time.
I am willing to work the required hours and days to ensure the job is done efficiently.
I am committed to meeting production targets and ensuring the team is motivated and productiv...
No, it is not advisable to leave without food to achieve a target.
It is important to maintain a healthy and balanced diet to sustain energy levels and productivity.
Skipping meals can lead to fatigue, decreased concentration, and potential health issues.
Taking regular breaks and eating nutritious meals can actually improve productivity in the long run.
Encourage a supportive work environment that promotes work-life balan
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Aptitude test
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
270
salaries
| ₹0 L/yr - ₹0 L/yr |
Trade Sales Manager
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
214
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
198
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Havells
Crompton Greaves Consumer Electricals
V-Guard Industries
Symphony