i
OPPO
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
To produce maximum output, one must optimize production processes, utilize resources efficiently, and motivate the workforce.
Optimize production processes by identifying bottlenecks and implementing solutions
Utilize resources efficiently by minimizing waste and maximizing utilization
Motivate the workforce by providing incentives, training, and a positive work environment
Yes, I am capable of handling the job pressure and long hours.
I have experience working in high-pressure environments and have developed the ability to manage my time effectively.
I am physically fit and able to stand for long periods of time.
I am willing to work the required hours and days to ensure the job is done efficiently.
I am committed to meeting production targets and ensuring the team is motivated and productiv...
No, it is not advisable to leave without food to achieve a target.
It is important to maintain a healthy and balanced diet to sustain energy levels and productivity.
Skipping meals can lead to fatigue, decreased concentration, and potential health issues.
Taking regular breaks and eating nutritious meals can actually improve productivity in the long run.
Encourage a supportive work environment that promotes work-life balan
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2019. There were 6 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2019. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specific period (e.g. 8 hours per day)
Determine the customer demand for that same period (e.g. 400 units per day)
Divide the total available production time by the customer demand to get the takt time (e.g. 8 hours / 400 units = 0.02 hours per unit)
When a machine stops working, immediate actions should be taken to diagnose and fix the issue to minimize downtime.
Check for any error messages or indicators on the machine
Inspect the machine for any visible damage or loose connections
Refer to the machine's manual for troubleshooting steps
Contact the maintenance team or a technician for assistance if needed
Implement a backup plan to ensure production is not significant
I am looking for a long-term career opportunity and plan to stay with the company for the foreseeable future.
I am committed to contributing to the company's success and growth over the long term.
I am interested in professional development opportunities within the company.
I plan to build strong relationships with colleagues and stakeholders to ensure a successful and fulfilling career.
I am open to discussing potential c...
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
A wire harness is a collection of wires, cables, and connectors that transmit electrical signals and power between different components in a system.
Wire harnesses provide a neat and organized way to route and protect wires in a system.
They ensure proper connectivity and prevent wire damage or short circuits.
Wire harnesses simplify troubleshooting and maintenance by allowing easy identification and replacement of faulty...
Sputtering is a process used in manufacturing to deposit thin films of material onto a surface.
Sputtering is a physical vapor deposition technique.
It involves bombarding a target material with high-energy ions or atoms.
This bombardment dislodges atoms from the target material, which then deposit onto a substrate.
Sputtering is commonly used in the production of semiconductor devices, solar cells, and thin film coatings.
...
I applied via Other and was interviewed before Dec 2016. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2021. There was 1 interview round.
Some of the top questions asked at the OPPO Production Supervisor interview -
based on 3 interviews
Interview experience
based on 20 reviews
Rating in categories
Sales Executive
607
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
493
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
349
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
310
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
220
salaries
| ₹0 L/yr - ₹0 L/yr |
Xiaomi
Samsung
Vivo
OnePlus