I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
posted on 10 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.
My salary is determined by factors such as my level of experience in the field.
Qualifications and certifications also play a role in determining my salary.
Market rates for Civil Site Engineers in the specific location where I work also influence my salary.
I am open to discussing salary expectations
posted on 10 Dec 2022
I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.
I have worked at XYZ Engineering Firm as a Civil Site Engineer.
Worked at XYZ Engineering Firm
Position: Civil Site Engineer
Responsibilities included site inspections, project management, and coordination with contractors
Completed projects include construction of a commercial building and a residential complex
As a Civil Site Engineer, my job profile involved overseeing construction projects, managing site operations, and ensuring compliance with safety regulations.
Managed and supervised construction projects from start to finish
Coordinated with architects, contractors, and subcontractors to ensure smooth project execution
Monitored site operations and ensured adherence to project plans and specifications
Performed quality con...
I have 5 years of experience as a Civil Site Engineer.
I have worked on various construction projects, including residential, commercial, and infrastructure.
During my time as a Civil Site Engineer, I have successfully managed and supervised construction activities.
I am well-versed in interpreting engineering drawings and specifications.
I have experience in conducting site inspections and ensuring compliance with safety ...
I worked as a Civil Site Engineer, responsible for overseeing construction projects and ensuring their successful completion.
Managed and supervised construction activities on site
Ensured compliance with building codes and regulations
Collaborated with architects, contractors, and other professionals
Prepared and reviewed project plans, drawings, and specifications
Monitored progress and quality of work
Resolved any issues ...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Software or tool test
based on 1 interview
Interview experience
based on 1 review
Rating in categories
CNC Operator
53
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Quality Engineer
35
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Quality Inspector
31
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
CNC Milling Operator
26
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
CNC Machine Operator
24
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Walplast Products
Hartek Group
CQRA
Patel Infrastructure