The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before May 2023. There were 4 interview rounds.
Basic math and mechanical engineering basics
Any general topic given on spot
I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
The size of a slump cone is a tool used in concrete testing to measure the consistency of fresh concrete.
The size of a slump cone is typically 12 inches in height.
The base diameter of a slump cone is usually 8 inches.
The top diameter of a slump cone is typically 4 inches.
The size of a slump cone may vary depending on specific testing requirements or standards.
The dimensions of a slump cone are important for accurate me...
To estimate aggregate quantity for a 200sqmt slab, calculate the volume of concrete required and then determine the aggregate quantity based on the mix ratio.
Calculate the volume of concrete required for the slab
Determine the mix ratio of concrete (e.g., 1:2:4)
Calculate the volume of aggregates needed based on the mix ratio
Consider the bulk density of aggregates to convert volume to weight
Account for wastage and add a
Before casting, civil engineers need to check the quality of various elements.
Quality of concrete mix
Quality of reinforcement bars
Quality of formwork
Quality of water used in the mix
Quality of curing process
The number of cubes required for 250 cubic meters of concrete depends on the size of the cubes.
The size of the cubes needs to be specified to determine the number required.
The volume of each cube needs to be calculated.
Divide the total volume of concrete (250 cubic meters) by the volume of each cube to get the number of cubes required.
For example, if the cubes are 1 cubic meter in size, then 250 cubes would be needed.
Post concrete quality inspection involves evaluating the quality of concrete after it has been placed and hardened.
Inspect the concrete for any visible defects such as cracks, honeycombing, or segregation.
Check the concrete strength by conducting compressive strength tests on samples taken from the structure.
Assess the concrete's durability by examining its resistance to factors like freeze-thaw cycles or chemical expo...
based on 1 interview
Interview experience
HR Recruiter
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Payroll Executive
11
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Resident Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Randstad
Team Lease
Quess
Kelly Services