Filter interviews by
I applied via Company Website and was interviewed in Oct 2020. There was 1 interview round.
To check a motor, perform visual inspection, check electrical connections, measure insulation resistance, test motor windings, and check motor bearings.
Perform a visual inspection to check for any physical damage or loose connections.
Check the electrical connections to ensure they are tight and secure.
Measure the insulation resistance using a megohmmeter to check for any insulation breakdown.
Test the motor windings usi...
Yes, I have knowledge of programming. FRL unit is a device used in pneumatic systems to regulate air pressure and filter out impurities.
I am proficient in programming languages such as C++, Java, and Python.
The FRL unit is an important component in pneumatic systems that helps to regulate air pressure and filter out impurities.
It consists of three main parts: the filter, regulator, and lubricator.
The filter removes imp...
Check power supply and motor coupling
Check if the pump is receiving power supply
Check if the motor coupling is intact
Check if there are any blockages in the suction line
Check if the impeller is damaged
Check if the pump is primed
Check if the discharge valve is open
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Remove duplicates from a list of strings
Create a new empty list to store unique strings
Iterate through the original list and add each string to the new list only if it's not already present
Return the new list with duplicates removed
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
ASM Technologies interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.
Given Component automation part
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Jun 2023. There were 4 interview rounds.
Geas fit and tolerance
I appeared for an interview before Feb 2024.
Code on string , duplicate list
Top trending discussions
The duration of ASM Technologies interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interviews
Interview experience
based on 380 reviews
Rating in categories
Software Engineer
195
salaries
| ₹2.9 L/yr - ₹12.1 L/yr |
Project Lead
116
salaries
| ₹6.4 L/yr - ₹15 L/yr |
Senior Design Engineer
112
salaries
| ₹4 L/yr - ₹15 L/yr |
Senior Engineer
109
salaries
| ₹5 L/yr - ₹14 L/yr |
Senior Software Engineer
82
salaries
| ₹6 L/yr - ₹25 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International