Upload Button Icon Add office photos

Filter interviews by

Asian Power Interview Questions and Answers

Updated 10 Mar 2020

Asian Power Interview Experiences

1 interview found

Interview Questionnaire 

3 Questions

  • Q1. About circuit breakr,transformer rating
  • Q2. 11kv transformer stepdown transformer
  • Q3. What u will do after vacuum circuit breaker trip
  • Ans. 

    After vacuum circuit breaker trip, I will investigate the cause and reset the breaker if necessary.

    • Investigate the cause of the trip

    • Check for any faults or abnormalities in the circuit

    • Reset the breaker if necessary

    • Ensure proper functioning of the circuit after reset

  • Answered by AI

Lab Technician/Medical Technician/Lab Staff Interview Questions asked at other Companies

Q1. 1.what is size of needle we used in regular?
View answer (19)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - One-on-one 

(4 Questions)

  • Q1. Upvc and aluminium team leader
  • Q2. Upvc and aluminium team leader
  • Q3. Joining date ear package
  • Q4. Monthly salary
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn

Round 1 - Aptitude Test 

My aptitude test should be taken from Math Science.

Round 2 - Technical 

(4 Questions)

  • Q1. Electrical engineering
  • Q2. What is a transformer?
  • Q3. How does a thermal power plant work ?
  • Q4. What is the difference between high voltage transmission line and low voltage transmission line?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to work CVT in transmission line
  • Q2. Working of wave trap
Round 2 - HR 

(2 Questions)

  • Q1. Testing of transformer
  • Q2. What is PRV
Round 3 - Technical 

(2 Questions)

  • Q1. About lighting arrester
  • Q2. Line shutdown related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good but I have not completed my Bachelor degree that's why..............
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. General discussion
  • Q2. What is your previous work experience?
  • Q3. Gdnt related questions
  • Q4. Components used in compressor and types of compressor
  • Q5. Why do you want to join our organisation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. About experience
  • Q2. General questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. About experience
  • Q2. General questions
Round 3 - One-on-one 

(2 Questions)

  • Q1. About experience
  • Q2. Job knowledge, communication and questions based on case scenario

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. Rules and safety
  • Q2. Salery package and comfrom
  • Q3. No question issue
  • Q4. No question problem
  • Q5. No question problem answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality assurance department
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Area on interest
  • Q2. Working
Round 2 - HR 

(2 Questions)

  • Q1. Quality assurance
  • Q2. Family
Round 3 - Case Study 

Construction of pv module in solar company

Round 4 - Assignment 

Automatic solar panels

Round 5 - Aptitude Test 

Solar cells manufacturing

Round 6 - Technical 

(2 Questions)

  • Q1. Glass loading machine in solar company
  • Q2. Working
Round 7 - Case Study 

Paddle power waching machine

Round 8 - One-on-one 

(2 Questions)

  • Q1. Quality assurance
  • Q2. 7 qc tools

Interview Preparation Tips

Interview preparation tips for other job seekers - How to make pv module in solar company
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Rejection analysis
  • Q2. Measurement system analysis
Round 2 - Technical 

(2 Questions)

  • Q1. Failure mode effects analysis
  • Q2. Controlling mathod
Round 3 - Technical 

(2 Questions)

  • Q1. Statistics process control
  • Q2. Instrument measurement
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself",
  • Ans. 

    Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.

    • Over 5 years of experience in site supervision

    • Strong knowledge of construction processes and safety regulations

    • Effective communication skills with team members and clients

    • Managed multiple projects simultaneously, ensuring deadlines were met

    • Implemented cost-saving measures without compro

  • Answered by AI
  • Q2. Why do you want this job?
  • Ans. 

    I am passionate about leading teams and ensuring projects are completed successfully.

    • I have a strong background in construction and project management.

    • I enjoy the challenge of overseeing multiple tasks and problem-solving on site.

    • I am motivated by the opportunity to mentor and develop team members.

    • I thrive in fast-paced environments and am dedicated to delivering high-quality results.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are your strengths?
  • Ans. 

    My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.

    • Strong leadership skills

    • Excellent communication abilities

    • Proactive approach to problem-solving

  • Answered by AI
  • Q2. What are your weaknesses?
  • Ans. 

    One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.

    • I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.

    • I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.

    • I can be overly self-critical, which can affect my confidence in certain situations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Week in interview but Not For Work that's my Wiknase or Strength 👍

Asian Power Interview FAQs

What are the top questions asked in Asian Power interview?

Some of the top questions asked at the Asian Power interview -

  1. what u will do after vacuum circuit breaker t...read more
  2. 11kv transformer stepdown transfor...read more
  3. about circuit breakr,transformer rat...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 206 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.0
 • 126 Interviews
Torrent Power Interview Questions
3.7
 • 124 Interviews
Eaton Corporation Interview Questions
4.0
 • 116 Interviews
GE Vernova Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all

Asian Power Reviews and Ratings

based on 2 reviews

3.8/5

Rating in categories

3.6

Skill development

1.8

Work-life balance

3.3

Salary

4.1

Job security

3.3

Company culture

2.6

Promotions

4.1

Work satisfaction

Explore 2 Reviews and Ratings
Electrical Engineer
4 salaries
unlock blur

₹1.5 L/yr - ₹3 L/yr

Explore more salaries
Compare Asian Power with

Suzlon Group

4.0
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Adani Group

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview