i
Arkade Group
Filter interviews by
Top trending discussions
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2020. There was 1 interview round.
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.
It indicates the flexibility in scheduling a particular activity.
Activities with zero Total Float are considered critical path activities.
Total Float helps project managers in managing project schedules eff
Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.
Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.
Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.
Equipment costs, such as rental of concrete mix...
posted on 29 Jan 2024
I applied via campus placement at University Vishveshvaraya College of Engineering (UVCE) and was interviewed in Dec 2023. There was 1 interview round.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume of steel.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel alloy.
For example, the density of carbon steel is typically around 7.85...
Men are dominant in site work due to various societal and cultural factors.
Historically, construction and site work have been male-dominated industries.
Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.
Physical demands and safety concerns associated with site work may discourage some women from entering the field.
Lack of representation and mentorship for women in si...
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.
The density of cement, steel, and aggregate varies.
The density of cement typically ranges from 1,100 to 1,500 kg/m³.
The density of steel is around 7,800 kg/m³.
The density of aggregate depends on its type, with values ranging from 1,400 to 2,900 kg/m³.
These values may vary depending on the specific composition and properties of the materials.
The Slump test is used to measure the consistency of fresh concrete before it sets.
It measures the workability of concrete.
It determines the water content in the concrete.
It helps to ensure that the concrete is of the desired consistency for the intended use.
The test involves filling a standard slump cone with fresh concrete and then measuring the slump of the concrete after the cone is removed.
The slump is the differe...
15-day program sheet for steel quantity of 850 sqft, 60 columns of size 600x300 mm, 30 Mt steel & steel shuttering.
Prepare a detailed BOQ for steel and shuttering
Calculate the required manpower and machinery
Plan the procurement and delivery of materials
Schedule the fabrication and installation of steel
Allocate time for quality checks and inspections
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
8
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Site Engineer
8
salaries
| ₹4.6 L/yr - ₹7.8 L/yr |
Sales Manager
6
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Assistant Manager CRM
6
salaries
| ₹5.7 L/yr - ₹7.5 L/yr |
Executive Accountant
5
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Prestige Group
DLF
Godrej Properties
Sobha