Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Arkade Group Team. If you also belong to the team, you can get access from here

Arkade Group Verified Tick

Compare button icon Compare button icon Compare
4.5

based on 138 Reviews

Filter interviews by

Arkade Group Project Manager Interview Questions and Answers

Updated 29 Jun 2024

Arkade Group Project Manager Interview Experiences

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About the project ,how to handle the project
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation 10-15% from previous firm

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical be strong,Agree for 25-30% hike in package
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects
Round 3 - HR 

(1 Question)

  • Q1. Joining period Percentage of salary hike

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Why you want to leave your current company?
  • Ans. Better prospect in terms of career development where along with the company I can also progress & prosper in terms of knowledge, skills & remuneration and can contribute to company success and growth story.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and transparent in your communication. If you don't have knowledge of something ask, politely say I am not aware and will try to find out and get back to you.

I applied via Referral and was interviewed in Sep 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Asking for HVAC designer who design urself each and everything means need designer or consultant
  • Q2. My query is that why call for interview if not match the actual requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to very confirm the profile what employer wants instead over demand a person who can look after each and everything , this feature relevance and also confuse the candidate and also cheat them , waste of time and energy
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Total Float?
  • Ans. 

    Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.

    • It indicates the flexibility in scheduling a particular activity.

    • Activities with zero Total Float are considered critical path activities.

    • Total Float helps project managers in managing project schedules eff

  • Answered by AI
  • Q2. Rate Analysis of Shuttering?
  • Ans. 

    Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.

    • Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.

    • Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.

    • Equipment costs, such as rental of concrete mix...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at University Vishveshvaraya College of Engineering (UVCE) and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is density of steel
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is a measure of how much mass is contained in a given volume of steel.

    • It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel alloy.

    • For example, the density of carbon steel is typically around 7.85...

  • Answered by AI
  • Q2. Why men is dominant in site work than women?
  • Ans. 

    Men are dominant in site work due to various societal and cultural factors.

    • Historically, construction and site work have been male-dominated industries.

    • Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.

    • Physical demands and safety concerns associated with site work may discourage some women from entering the field.

    • Lack of representation and mentorship for women in si...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Project duration
  • Ans. 

    The project duration can vary depending on the scope, complexity, and resources available.

    • Project duration is typically determined during the planning phase

    • Factors such as scope changes, resource availability, and unexpected challenges can impact project duration

    • It is important to regularly monitor and adjust the project timeline as needed

  • Answered by AI

I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Density of Cement, Steel & Aggregate?
  • Ans. 

    The density of cement, steel, and aggregate varies.

    • The density of cement typically ranges from 1,100 to 1,500 kg/m³.

    • The density of steel is around 7,800 kg/m³.

    • The density of aggregate depends on its type, with values ranging from 1,400 to 2,900 kg/m³.

    • These values may vary depending on the specific composition and properties of the materials.

  • Answered by AI
  • Q2. What is the purpose of Slump test?
  • Ans. 

    The Slump test is used to measure the consistency of fresh concrete before it sets.

    • It measures the workability of concrete.

    • It determines the water content in the concrete.

    • It helps to ensure that the concrete is of the desired consistency for the intended use.

    • The test involves filling a standard slump cone with fresh concrete and then measuring the slump of the concrete after the cone is removed.

    • The slump is the differe...

  • Answered by AI
  • Q3. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 columns of size 600×300 mm and 3.0 m height, 30 Mt steel & Steel shuttering.
  • Ans. 

    15-day program sheet for steel quantity of 850 sqft, 60 columns of size 600x300 mm, 30 Mt steel & steel shuttering.

    • Prepare a detailed BOQ for steel and shuttering

    • Calculate the required manpower and machinery

    • Plan the procurement and delivery of materials

    • Schedule the fabrication and installation of steel

    • Allocate time for quality checks and inspections

  • Answered by AI

Interview Preparation Tips

Topics to prepare for DEC Infra Project Engineer - Civil interview:
  • Project Planning
  • Quantity Surveying
  • IS codes
Interview preparation tips for other job seekers - Before going to interview should be aware in basics of civil engineering like Planning & Qs. Execution.

Arkade Group Interview FAQs

How many rounds are there in Arkade Group Project Manager interview?
Arkade Group interview process usually has 1 rounds. The most common rounds in the Arkade Group interview process are Technical.

Tell us how to improve this page.

Arkade Group Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Arkade Group Project Manager Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
8 salaries
unlock blur

₹5 L/yr - ₹12.5 L/yr

Site Engineer
8 salaries
unlock blur

₹4.6 L/yr - ₹7.8 L/yr

Sales Manager
6 salaries
unlock blur

₹7 L/yr - ₹13.5 L/yr

Assistant Manager CRM
6 salaries
unlock blur

₹5.7 L/yr - ₹7.5 L/yr

Executive Accountant
5 salaries
unlock blur

₹2.6 L/yr - ₹6 L/yr

Explore more salaries
Compare Arkade Group with

Prestige Group

4.3
Compare

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview