Arihant Superstructures Civil Site Engineer Interview Questions and Answers

Updated 22 Oct 2021

Arihant Superstructures Civil Site Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. ,how to build high rise buildings
  • Ans. 

    High rise buildings require careful planning, design, and construction techniques.

    • Site selection and analysis

    • Structural design and analysis

    • Foundation design and construction

    • Use of high-strength materials

    • Installation of elevators and other building systems

    • Safety measures for workers and occupants

    • Quality control and testing

    • Regular maintenance and inspections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I join this company finaly 😍😍

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Start to bottom rcc work up to finishing work
  • Q2. Finishing sequence(block work- concild zari -waterproof work-concild piping, electrical work- internal gypsum., dado work, painting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience of building &infrastructure execution work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing activities
  • Q2. Types of paints, tiles.
  • Ans. 

    Types of paints and tiles commonly used in construction projects.

    • Types of paints: acrylic, latex, oil-based, enamel, spray paint

    • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions will be asked based on your past experience.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.

I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Everything related to our field
  • Q2. Past and current project contributions
  • Q3. What do you think about SPCPL

Interview Preparation Tips

Interview preparation tips for other job seekers - Being a professional firm, professional interview and presentation needs to clear

I was interviewed in Jan 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Related of civil construction and DI pipe line

Interview Preparation Tips

Interview preparation tips for other job seekers - Do hard work and be truthfull,keep trying unto reach your goals,dont give up
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What types of HVAC systems
  • Ans. 

    There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.

    • Central HVAC systems use ducts to distribute air throughout a building

    • Split systems have separate indoor and outdoor units

    • Packaged systems have all components in one unit

    • Ductless systems use individual units in each room

    • Geothermal systems use the earth's temperature to heat and cool a building

  • Answered by AI
  • Q2. Design and functions of HVAC system.
  • Ans. 

    HVAC system is designed to control temperature, humidity, and air quality in a building.

    • HVAC stands for Heating, Ventilation, and Air Conditioning.

    • It includes components such as air handlers, ductwork, filters, and thermostats.

    • The system works by circulating air through the building and adjusting temperature and humidity levels.

    • It also helps to remove pollutants and maintain air quality.

    • Examples of HVAC systems include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make you next great hire on LinkedIn.
Post a job for free.

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Where is the lapping zone in Beams, Columns and Slab?
  • Ans. 

    The lapping zone in beams, columns, and slabs is the area where reinforcement bars overlap to ensure structural integrity.

    • Lapping zone is typically located at the ends of beams, columns, and slabs.

    • It is necessary to provide sufficient overlap of reinforcement bars to transfer loads effectively.

    • The length of the lapping zone depends on the design requirements and the diameter of the reinforcement bars.

    • Lapping helps in m...

  • Answered by AI
  • Q2. How much load does 1.5m MS prob take?
  • Ans. 

    The load capacity of a 1.5m MS probe depends on various factors and cannot be determined without additional information.

    • The load capacity of a 1.5m MS probe depends on its diameter, material composition, and design.

    • The soil conditions and type of foundation also play a significant role in determining the load capacity.

    • Without specific details about the probe and the project requirements, it is not possible to provide a...

  • Answered by AI
  • Q3. What is the unit weight of Cement mortar?
  • Ans. 

    The unit weight of cement mortar varies depending on the mix ratio and the density of the materials used.

    • The unit weight of cement mortar is typically between 2200 to 2500 kilograms per cubic meter (kg/m³).

    • The unit weight can be calculated by multiplying the density of cement mortar by the volume of the material.

    • The density of cement mortar is influenced by the proportions of cement, sand, and water in the mix.

    • Differen...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm looking for a job which fulfils my requirement and to explore my knowledge.
Please let me know about the same.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Experience and work
  • Q2. Project location and ctc
Round 2 - Technical 

(2 Questions)

  • Q1. About project and site related questions
  • Q2. On the basis of your project
Round 3 - Aptitude Test 

Only objective questions little bit tough but all ok

Interview Preparation Tips

Interview preparation tips for other job seekers - You prepare you current project all questions should be ask of you current project
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Sonata Software

No Interviews

INTERVIEWS

Maruti Suzuki

No Interviews

INTERVIEWS

Maruti Suzuki

No Interviews

CAMPUS PLACEMENT

Raja Balwant Singh College, Agra

INTERVIEWS

Collabera Technologies

No Interviews

INTERVIEWS

ZF Friedrichshafen

No Interviews

INTERVIEWS

Infosys BPM

No Interviews

INTERVIEWS

LTIMindtree

No Interviews

Tell us how to improve this page.

Arihant Superstructures Civil Site Engineer Salary
based on 8 salaries
₹2 L/yr - ₹4.9 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Arihant Superstructures Civil Site Engineer Reviews and Ratings

based on 2 reviews

4.5/5

Rating in categories

4.5

Skill development

3.5

Work-life balance

3.0

Salary

2.5

Job security

3.1

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 2 Reviews and Ratings
Senior Sales Manager
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Manager
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

CRM Executive
13 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
13 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sourcing Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Arihant Superstructures with

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent